- 1、本文档共21页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
空调知识(国外英文资料)
空调知识(国外英文资料)
Inspection and crew condition before mechanical operation
(1) the installation is finished and inspected - before the test runs, all installations must be inspected.
Inspection of machinery installation of the unit: check whether all the pipes and accessories have been installed; Check for the ease of the mechanical rotation: check the installation records at the same time.
All projects that are related to the installation of centrifugal refrigeration units shall be completed, such as earth construction, water supply and drainage, electrical, instrument and heating, etc. Inspection of the foundations fastness and the integrity of the floor, and whether the trench cover is complete; Check whether the water pump is normal and the circulating water is in line with the requirements; Check the various gauges for which the debugging is used, whether they are normal and complete, and have no certificate of conformity and calibration tests. Check whether the circuit system has been tested, and whether the action is correct.
Check for all safety measures: water supply and water line system installation, and ensure the passage of water. The fire equipment is ready; Winter test of temperature in the engine room should be more than 15 ℃, clean environment, the roads around the unit.
If the unit leaves the factory for more than 6 months or the nitrogen in the machine has been leaking, it should be thoroughly dismantled. There must be a special person responsible for the dissection. Apply nitrogen to the assembly and then apply the oil to the friction area.
(2) the state of the compressor, the state of the lubricating oil system, the electrical wiring and the state of the site, prior to the operation of the unit.
The state of the compressor. The inlet of the compressor inlet is open and communicates with the atmosphere. The float chamber and the screen are removed and connected to the atmosphere. Take out the float valve parts and add cover to the throttle holes. The
您可能关注的文档
- 珍惜资源(国外英文资料).doc
- 球墨铸铁的曲轴发展和锻造(国外英文资料).doc
- 理光复印机代码表(国外英文资料).doc
- 理光打印机维修代码(国外英文资料).doc
- 理光数码复印机维修代码大全(国外英文资料).doc
- 环境工程实习心得(国外英文资料).doc
- 理光机器代码(国外英文资料).doc
- 理性、容性和阻性电阻(国外英文资料).doc
- 理想GR1710故障代码详解(国外英文资料).doc
- 理想GR机型(国外英文资料).doc
- 职业技术学院2024级工业机器人技术(安装与维护)专业人才培养方案.docx
- 职业技术学院2024级应用化工技术专业人才培养方案.pdf
- 职业技术学院2024级软件技术(前端开发)专业人才培养方案.pdf
- 职业技术学院2024软件技术专业人才培养方案.docx
- 职业技术学院2024级信息安全技术应用(安全运维)专业人才培养方案.docx
- 职业技术学院2024级新能源汽车检测与维修技术(车辆鉴定与评估)专业人才培养方案.pdf
- 职业技术学院2024级石油炼制技术专业人才培养方案.pdf
- 职业技术学院2024级环境监测技术专业人才培养方案.docx
- 职业技术学院2024级汽车制造与试验技术专业人才培养方案.pdf
- 职业技术学院2024级信息安全技术应用专业人才培养方案.pdf
文档评论(0)