CNC工程师工厂经验。txt(国外英语资料).doc

CNC工程师工厂经验。txt(国外英语资料).doc

  1. 1、本文档共13页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
CNC工程师工厂经验。txt(国外英语资料)

CNC工程师工厂经验。txt(国外英语资料) CNC engineer, plant experience. Txt.txt marriage is like wearing a cotton padded jacket for free. Its not easy to move, but its very warm. Falling in love is like peeling onions. Theres always a layer of tears going on. 1. define the responsibilities of the programmer responsible for the processing quality, processing efficiency, cost control and error control throughout the CNC manufacturing process of the mold. 2. programmers receive new mold, we must understand the requirements of the mold, the rationality of the mold structure, steel used before and after the mold, product tolerances requirements, beer plastic material. It is clear where the glue is, where the PL is, where it is touched and rubbed and where it can be avoided. 3. programmers receive the new model, in principle, the first time to open copper material list, fill out the list must first remove the copper, and can not be trimmed, but to have the size of the bottom of the hand to determine the copper standard code, spark size. The first batch of copper materials must be opened within 2 days, and all copper materials will be opened within 10 days, which can be divided into 4 bills of materials. 4. copper, rough, young and male construction drawings were completed with 2 construction drawings, spark spaces must be filled to the designated place. The workpiece can be in the old machine, please tick in the construction drawing machine and the corresponding column of machine tool, workpiece in high speed machining must be indicated in the note column. Not in the CNC construction drawings, fully articulate the direction of the workpiece, must be accompanied by a printed orientation map, can make people clear at a glance. The steel shall be in charge of the actual work, confirming the reference direction, the size of the workpiece and the machined surface. 5. when the steel material is open, the amount of Z under 0.5-0.7mm. When the copper material is open, the amount of Z under the k

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档