- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
SMT制程管控要点(国外英语资料)
SMT制程管控要点(国外英语资料)
1. solder paste control point
1-1 refrigerator temperature 0 ~ 10 degrees, thermometer calibration every six months.
1-2 solder paste according to flow number first in first out.
1-3, solder paste temperature 4hrs or more before you can use, beyond the 72hrs is not used, must be returned to the refrigerator. Use
Stir for 7 minutes.
1-4 turn on the solder paste and use it in 12hrs. 1-5 degrees solder paste storage period of 4 months.
1-6 temperature zone at any time to maintain four bottles of solder paste.
1-7 gloves must be provided.
1-8 solder paste control should have W/I
1-9, the mixer should have W/I, but need not check, but need to verify the time
2. MPM control point
2-1 must bring electrostatic gloves.
2-2 have the direction of S.O.P intake plate.
The program of 2-3 S.O.P is the same as the program on the machine.
2-41 hours, two pieces, measurement of tin thickness, tin thickness standard (steel thickness + 0.05) + 0.03.
2-5 steel plate life 20000 times, S/O must be registered at the end of use.
2-6 clean the steel plate every two hours and register.
2-7 steel tension 30~45N/cm.
2-8 day, week, month maintenance record, log on the machine.
2-9 prints are examined with 3 magnification lenses.
2-10 stick to S/N Label.
2-11 solder paste thickness gauge is adjusted once a year.
2-12 MPM and solder paste thickness gauge should have W/I.
3. CP rapid machine control point
3-1 grounding table must be equipped with electrostatic gloves and electrostatic ring.
3-2 S.O.P..
The program on 3-3 S.O.P. must be the same as the program on the material list and on the machine.
3-4 change parts to measure R.L.C. and record, R.L.C. check once every half a year.
R STD range 3 yards = 5%, 1 yards = 1%
C L has no body + 20%, others are specified on W/I.
3-5 day, week, month maintenance record, log on the machine.
3-6 Support Pin.
3-7, the machine should have W/I
4. GSM universal control point
4-1, grounding on the table, with electrostatic gloves and electrosta