- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
土木第一章作业(国外英语资料)
土木第一章作业(国外英语资料)
Chapter 1 exercise 1
The filling volume of a site with 4000m3 is required to be filled from nearby soil and its soil is compacted sand and clay:
The amount of excavation backfill;
What is the number of vehicles to be transported if the bucket capacity of transport is 2m3.?
Solution: Table 1.1 sand clay is taken as three types of soil, KS = 1.24~1.3, kS =1.05~1.07
When computing, if you take the big value, then KS take 1.3, kS, take 1.07
Set the amount of excavation filling for V (V1), dig the formula KS = V2/V1, KS = V3/V1
It was by:
V3 = 4000
KS = V3/V1
1.07 = 4000/V1
V1=3738.32 (M3), that is, the amount of excavation is 3738.32 m3.
V2=V1 * KS=3738.32 * 1.3=4859.82
N=v2/2=2429.91 take n=2430 (car)
Chapter 1 exercise 2
The known site after the formation of the ground elevation is 225, the trench bottom elevation is 222, 2 meters wide, hard plastic loam soil, artificial digging and soil thrown at the top. The upper width of trench trench trench, and draw the plan and section.
Solution: H = 225-222 = 3 (meters)
Look up table 1.5
Hard plastic sub clay, static loading, m=0.5, dynamic loading, m=0.67
Static loading B=m * H=3 * 0.5=1.5 (m)
Mouth width 2+1.5 * 2 = 5 (meters)
Chapter 1 exercise 3
The central line of a trench is shown as shown in figure AB, 30m apart, BC apart from 20m, and the soil is clay. The design level of the bottom of the A point is 260. The vertical gradient of the bottom of the ditch is from 4 to C per thousand, and the width of the bottom of the ditch is 2m. A is designed to be excavated by backhoe, and the earthwork of AC section is calculated.
Answer: bottom 260 A point Delta HA=262.5-260=2.5 (m)
B point Delta HB=262.0- (260-30 * 0.004) ==2.12 (m)
C point Delta HC=261.5- (260-50 * 0.004) =1.7 (m)
Backhoe load m=0.67
A point bottom width 2+2 * 2.5 * 0.67 = 5.35
B point bottom width 2+2.12 * 2 * 0.67 = 4.84
C point bottom width 2+2 * 1.7 * 0.67 = 4.278
A point area AA = 0.5 * (2+5.35) * 2.5 = 9.19
B point area AB = 0.5 * (2+4.84) *
您可能关注的文档
最近下载
- 短暂性脑缺血发作的护理.ppt VIP
- B萱草花 正谱钢琴伴奏弹唱谱.pdf VIP
- 刺绣机电脑BECS-A15操作手册-大豪科技.PDF VIP
- 2025年港澳台联考物理试题及答案.docx VIP
- 2025年金融工程专业建设规划 .pdf VIP
- FCA-FineBI试卷及答案文档.docx VIP
- 关于学校人工智能赋能教育教学高质量发展三年行动计划(2025-2027).pdf VIP
- 2024年初级中式烹调师资格理论考前必刷必练题库500题(含真题、必会题).docx VIP
- 标准图集-DJBT50-133建设工程施工现场围挡及大门-标准图集.pdf VIP
- 1.4 七色光(教学设计)科学苏教版五年级上册.pdf VIP
文档评论(0)