土木第一章作业(国外英语资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
土木第一章作业(国外英语资料)

土木第一章作业(国外英语资料) Chapter 1 exercise 1 The filling volume of a site with 4000m3 is required to be filled from nearby soil and its soil is compacted sand and clay: The amount of excavation backfill; What is the number of vehicles to be transported if the bucket capacity of transport is 2m3.? Solution: Table 1.1 sand clay is taken as three types of soil, KS = 1.24~1.3, kS =1.05~1.07 When computing, if you take the big value, then KS take 1.3, kS, take 1.07 Set the amount of excavation filling for V (V1), dig the formula KS = V2/V1, KS = V3/V1 It was by: V3 = 4000 KS = V3/V1 1.07 = 4000/V1 V1=3738.32 (M3), that is, the amount of excavation is 3738.32 m3. V2=V1 * KS=3738.32 * 1.3=4859.82 N=v2/2=2429.91 take n=2430 (car) Chapter 1 exercise 2 The known site after the formation of the ground elevation is 225, the trench bottom elevation is 222, 2 meters wide, hard plastic loam soil, artificial digging and soil thrown at the top. The upper width of trench trench trench, and draw the plan and section. Solution: H = 225-222 = 3 (meters) Look up table 1.5 Hard plastic sub clay, static loading, m=0.5, dynamic loading, m=0.67 Static loading B=m * H=3 * 0.5=1.5 (m) Mouth width 2+1.5 * 2 = 5 (meters) Chapter 1 exercise 3 The central line of a trench is shown as shown in figure AB, 30m apart, BC apart from 20m, and the soil is clay. The design level of the bottom of the A point is 260. The vertical gradient of the bottom of the ditch is from 4 to C per thousand, and the width of the bottom of the ditch is 2m. A is designed to be excavated by backhoe, and the earthwork of AC section is calculated. Answer: bottom 260 A point Delta HA=262.5-260=2.5 (m) B point Delta HB=262.0- (260-30 * 0.004) ==2.12 (m) C point Delta HC=261.5- (260-50 * 0.004) =1.7 (m) Backhoe load m=0.67 A point bottom width 2+2 * 2.5 * 0.67 = 5.35 B point bottom width 2+2.12 * 2 * 0.67 = 4.84 C point bottom width 2+2 * 1.7 * 0.67 = 4.278 A point area AA = 0.5 * (2+5.35) * 2.5 = 9.19 B point area AB = 0.5 * (2+4.84) *

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档