8.14美加大停电分析资料.ppt

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
8.14美加大停电分析资料

ITC Analysis of Grid Collapse 8/17/2003 Precondition 8/14/03 3:06 PM High temperatures in the Midwest FirstEnergy’s (FE) 750 MW Davis-Bessie nuclear plant is down for maintenance The 550 MW FE Eastlake generating unit in Northern Ohio went offline at approximately 2:00 PM The Chamberlain- Harding transmission line feeding the city of Cleveland has just gone out of service Flows over Michigan’s interstate connections are normal 25 Minutes Later… 8/14/03 3:32 PM A second line feeding the city of Cleveland goes out of service Hanna-Juniper Transmission system near Cleveland experiences low voltage Flows on Michigan’s interstate connections remain steady 10 – 15 Minutes Later… 8/14/03 3:41 – 3:46 PM Two more transmission lines feeding Northern Ohio go out of service Star-South Canton Tidd-Canton Central Transmission system near Cleveland experiences severe low voltage Flows on Michigan’s interstate connections remain steady 20 Minutes Later… 8/14/03 4:06 PM The Sammis-Star transmission line feeding Northern Ohio from within Ohio goes out of service Flows on the ITC – FE interstate connection reverse and FE starts pulling 200 MW through Michigan 3 Minutes Later… 8/14/03 4:09 PM Two more transmission lines feeding Northern Ohio go out of service E.Lima-Fostoria Muskingum-OH Central Northern Ohio becomes electrically isolated from the rest of Ohio First Energy is suddenly pulling 2200 MW through Michigan’s Grid In less than 10 seconds the flows on the ITC – FE interstate connection jump by 2000 MW Flows on the ITC – IMO international connection reverse Voltage on the Michigan Grid begins to decline under the strain About 30 - 45 Seconds Later… 4:09:31 - 4:09:46 PM As a result of the declining voltage two power plants in Mid-Michigan with an aggregate capacity of approx. 1800 MW go offline within 15 seconds of one another Kinder-Morgan MCV Voltage begins to collapse (decline) in Michigan About 1 Minute Later… 4:10:40 - 4:10:46 PM The ITC sys

文档评论(0)

yan698698 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档