- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
8.14美加大停电分析资料
ITC Analysis of Grid Collapse 8/17/2003 Precondition 8/14/03 3:06 PM High temperatures in the Midwest FirstEnergy’s (FE) 750 MWDavis-Bessie nuclear plantis down for maintenance The 550 MW FE Eastlake generating unit in Northern Ohio went offline at approximately 2:00 PM The Chamberlain- Harding transmission line feeding the city of Cleveland has just gone out of service Flows over Michigan’s interstate connections are normal 25 Minutes Later… 8/14/03 3:32 PM A second line feeding the city of Cleveland goes out of service Hanna-Juniper Transmission system near Cleveland experiences low voltage Flows on Michigan’sinterstate connections remain steady 10 – 15 Minutes Later… 8/14/03 3:41 – 3:46 PM Two more transmission lines feeding Northern Ohio go out of service Star-South Canton Tidd-Canton Central Transmission system near Cleveland experiences severe low voltage Flows on Michigan’sinterstate connections remain steady 20 Minutes Later… 8/14/03 4:06 PM The Sammis-Star transmission line feeding Northern Ohiofrom within Ohio goes out of service Flows on the ITC – FEinterstate connection reverse and FE startspulling 200 MW throughMichigan 3 Minutes Later… 8/14/03 4:09 PM Two more transmission lines feeding Northern Ohio go out of service E.Lima-Fostoria Muskingum-OH Central Northern Ohio becomeselectrically isolated from the rest of Ohio First Energy is suddenlypulling 2200 MW through Michigan’s Grid In less than 10 seconds the flows on the ITC – FE interstate connection jump by 2000 MW Flows on the ITC – IMO international connection reverse Voltage on the MichiganGrid begins to declineunder the strain About 30 - 45 Seconds Later… 4:09:31 - 4:09:46 PM As a result of the declining voltage two power plants in Mid-Michigan with an aggregate capacity of approx. 1800 MW go offline within 15 seconds of one another Kinder-Morgan MCV Voltage begins to collapse (decline) in Michigan About 1 Minute Later… 4:10:40 - 4:10:46 PM The ITC sys
文档评论(0)