2014年新思维-考点狂背(终稿)--造价案例(国外英语资料)
2014年新思维-考点狂背(终稿)--造价案例
@ new thinking copyright all QQ:813517521
New thinking case analysis, top secret test center knowledge points
First question: investment estimation and financial analysis
I. knowledge points of investment estimation calculation
The similar engineering budget law: when the project completed the preliminary design and engineering or design in the construction of the similar and not
A similar engineering budget method can be used when available budgetary indicators are available. Adjustment content: architectural differences and spreads
(1) adjustment of building structure difference QQ:813517521
After adjustment of structural differences, the direct engineering cost = similar budget, direct engineering cost + new quantity * price - old quantity * price
Changes in the structure of the revised estimate index (yuan / M) = JQ1P1Q2P2
(2) price adjustment: only labor, materials, machinery costs and enterprise management fees or rates
D = A * K (D-, budget estimate cost of proposed project; A- single project budget cost; K- comprehensive adjustment factor);
K = a% * * * * K1b% K2c% K3d% K4e% * K5
A%, b%, c%, d%, similar to the project budget labor costs, materials costs, construction machinery and equipment use fees, enterprise management
Percentage of budgeted cost, such as a% = similar engineering cost / similar engineering budget cost * 100%, b%, c%, d%
Similar;
K1, K2, K3, K4, the project area and similar project budget cost in labor costs, material costs, machineries,
The coefficient of difference between management fees, such as K1 = labor cost (or wage standard) for the proposed project budget / similar project budget
Labour costs (or regional wage standards) are similar to those of K2, K2, and K3.
The estimation method of the static investment part of the a project planning and project proposal stage, low precision estimation of unit capacity
Method, productivity index method, proportion method, coefficient method, mixing method, B feasibility
您可能关注的文档
- (锅盖子)升级破解方法(国外英语资料).doc
- (考试时间:70分钟 试卷满分:70分 考试形式:开卷)(国外英语资料).doc
- (大一必读)写给即将踏入大一的同学,如何度过我的大学(国外英语资料).doc
- (持续添加修正)各地名店名厨多款流行火锅蘸料、味碟配方经典总汇(麻酱、沙茶、海鲜、香辣、肥牛等)(国外英语资料).doc
- (一)申请入本人递交入党申请书(国外英语资料).doc
- (强力推荐)大规模的海水运动(二)洋流对地理环境的影响(国外英语资料).doc
- (设计)工作细则 - 上海工程技术大学 继续教育学院(国外英语资料).doc
- (问答和操作题)(国外英语资料).doc
- 001探究题(黄冈市物理中考题调考题汇编)(国外英语资料).doc
- 01_NEW YORK SENATE RACE SPEECH(国外英语资料).doc
文档评论(0)