69-雷贝斯托摩擦产品(苏州)有限公司(国外英语资料).docVIP

69-雷贝斯托摩擦产品(苏州)有限公司(国外英语资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
69-雷贝斯托摩擦产品(苏州)有限公司(国外英语资料)

69-雷贝斯托摩擦产品(苏州)有限公司 Lay friction products (Suzhou) Co., Ltd. Annual output of automobile clutch surface 40 million pieces removal project Environmental impact statement Lay friction products (Suzhou) Co., Ltd. August 2008 Announcement of environmental impact assessment on the 40 million pieces of motor vehicle clutch surface of Suzhou Railway Products Co., Ltd. (1) brief description of construction projects; Construction project name: the project of 40 million pieces of automobile clutch surface for Suzhou Automobile Company Nature of the project: relocation Construction scale: 40 million pieces of automobile clutch surface are produced Construction site: Hu Tong area is located in Suzhou high tech Zone Xuguan group Xuguan Industrial Park, East Qinglian Road, across the road is open, West Lingan Yang Road, across the road is far east Wheel Co. Ltd., the North close to the river, the river is open, South Hu Qing Road, across the road is empty Total investment: the total investment of the project is 20 million US dollars, of which the environmental protection investment is 15 million yuan Labor quota and factory shifts: the project will consist of 400 people, daily working time is 24 hours, work 300 days a year. No room and board, breakfast, lunch and dinner served by fast food company (two) the possible environmental impact of construction projects After the proposed project is completed, the waste water is mainly domestic sewage and boiler sewage. The project after the completion of the atmospheric pollution source for sizing and winding process of ethanol, toluene, hot pressing and hardening process of ethanol, toluene, H2S gas, natural gas boiler combustion, weighing, grinding, drilling processes produce dust. The solid waste of the proposed project is dust, scrap, waste activated carbon, waste emulsion, waste cardboard boxes, cardboard and domestic waste. The noise of the proposed project mainly comes from the mixer, grinder, drilling machine, air compressor, bo

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档