Reserve fee, interest on construction loan
Reserve fee, interest on construction loan
Five, reserve fee, construction period loan interest
[cases
] a construction project construction costs 50 million yuan, equipment purchase costs 30 million yuan, other construction costs 20 million yuan, known as the basic reserve rate of 5%, the project pre construction period of 1 years, the construction period is 3 years, the annual investment plan, following the first year, completed an investment of 20%, second years 60%, third years 20%. The average annual investment price rising rate was 6%, during the construction project construction cost for the price.
Solution: basic reserve fee = (5000+3000+2000) x 5%=500 yuan
Static investment =5000+3000+2000+500=10500 yuan
Completion of the first year of construction investment =10500 x 20%=210 million
First year price increase reserve fee is: PF1=I1[(1+f) (1+f) 0.5 - 1] =19.18 yuan
Second years to complete investment =10500 x 60%=630 million
Second years price increase reserve fee: PF2=I2[(1+f) (1+f) 0.5 (1+f) - 1]=98.79 million
Third years to complete investment =10500 x 20%=210 million
Third years price increase reserve fee: PF3=I3[(1+f) (1+f) 0.5 (1+f) 2 - 1]=47.51 million
Therefore, the preparatory price for the construction period is:
PF=19.18+98.79+47.51=165.48 yuan
(a case) a new project, the construction period of 3 years, the annual balance of loans, the first year loans 3 million yuan,
Second years 6 million yuan, third years 4 million yuan, the annual interest rate of 12%, the construction period interest only interest, not pay, calculate the construction period loan interest.
Solution: during the construction period, interest rates are calculated as follows:
Investment estimate (Part I)
Second section investment estimate
I. contents of investment estimation and estimation steps.
Total investment, construction investment, project cost, construction project fee
Acquisition fees for equipment and equipment
Install
您可能关注的文档
- 2007中考二轮复习提优专题强化训练(国外英语资料).doc
- 2007中国大连国际工作船艇展览会(国外英语资料).doc
- 2007复旦大学系际辩论赛 (正方 恋爱靠勤奋 反方 恋爱靠缘分)太经典了(国外英语资料).doc
- 2007年一级建造师市政实务真题及答案(国外英语资料).doc
- 2007年班主任工作经验总结(国外英语资料).doc
- 2007年高考英语阅读技巧点拨课件 人教版(国外英语资料).doc
- 2007预备党员转正申请书(国外英语资料).doc
- 2007复旦大学系际辩论赛 (正方 恋爱靠勤奋 反方 恋爱靠缘分)太经典(国外英语资料).doc
- 2007高考满分作文:梦想在现实中起舞(山东)(国外英语资料).doc
- 2008-9-26类比反义总结(国外英语资料).doc
文档评论(0)