filename4(国外英语资料).doc

  1. 1、本文档共26页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
filename4(国外英语资料)

filename4 Reserve fee, interest on construction loan Reserve fee, interest on construction loan Five, reserve fee, construction period loan interest [cases ] a construction project construction costs 50 million yuan, equipment purchase costs 30 million yuan, other construction costs 20 million yuan, known as the basic reserve rate of 5%, the project pre construction period of 1 years, the construction period is 3 years, the annual investment plan, following the first year, completed an investment of 20%, second years 60%, third years 20%. The average annual investment price rising rate was 6%, during the construction project construction cost for the price. Solution: basic reserve fee = (5000+3000+2000) x 5%=500 yuan Static investment =5000+3000+2000+500=10500 yuan Completion of the first year of construction investment =10500 x 20%=210 million First year price increase reserve fee is: PF1=I1[(1+f) (1+f) 0.5 - 1] =19.18 yuan Second years to complete investment =10500 x 60%=630 million Second years price increase reserve fee: PF2=I2[(1+f) (1+f) 0.5 (1+f) - 1]=98.79 million Third years to complete investment =10500 x 20%=210 million Third years price increase reserve fee: PF3=I3[(1+f) (1+f) 0.5 (1+f) 2 - 1]=47.51 million Therefore, the preparatory price for the construction period is: PF=19.18+98.79+47.51=165.48 yuan (a case) a new project, the construction period of 3 years, the annual balance of loans, the first year loans 3 million yuan, Second years 6 million yuan, third years 4 million yuan, the annual interest rate of 12%, the construction period interest only interest, not pay, calculate the construction period loan interest. Solution: during the construction period, interest rates are calculated as follows: Investment estimate (Part I) Second section investment estimate I. contents of investment estimation and estimation steps. Total investment, construction investment, project cost, construction project fee Acquisition fees for equipment and equipment Install

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档