- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
RC150280高压清洗设备技术方案(国外英语资料)
RC150280高压清洗设备技术方案
1 United States
SPM
Two million nine hundred and sixty-six thousand
210 thousand volts high
Piezoelectric variable frequency motor
One
Hunan
3 universal coupling
1 days, Shuo
4 safety relief valve
1 United States
SPM
5 pressure regulating valve
1 United States
6 pipes and fittings
1 domestic high-quality
7 water injection pump
1 domestic high-quality
8 install the base
1 honors
9 filter
1 domestic high-quality
10 high pressure sensor
1 United States
11 pressure indicator
1 domestic high-quality
12 low pressure sensor
1 domestic high-quality
13 pressure indicator
1 domestic high-quality
14 pressure gauge
1 United States
Fifteen
High pressure plunger pump
Forced lubrication system
The
One
U.S.A
Sixteen
High pressure pump power
External lubrication
system
prosperous
1 Frequency Converter
1 SIEMENS
Eight
control section
2 PLC control panel
1 OMRON
One million seven hundred and eighty-three thousand six hundred and eighty
3 vacuum contactor
1 Schneider
5 circuit breaker
1 Schneider
6 cable
1 domestic quality
7 cable float solution
Bit switch
One
Shanghai School of thought
8 other electrical elements
piece
According to the needs of
Schneider
The total price of bare metal devices
Four million seven hundred and forty-nine thousand six hundred and eighty
Attached parts
1 high pressure resin pipe
20/6R
100 meters
One hundred and five thousand
Eight hundred and two thousand one hundred and fifty
2 high pressure pipe management and protection
set
20/6
100 meters
Fifteen thousand
3 coil pipe (match)
20/6 high voltage
Tube)
1
Six hundred and eighty thousand
4 high pressure pipe buckle
20/6
1
Eight hundred
5 flexible buckle
1
One hundred and fifty
6 pipe cleaning water
policeman
1
One thousand and two hundred
Remarks:
1. the delivery date of the main contract is effective after the contract
5 months.
2. the time of delivery of the parts is the effect of the contract
1 months.
Beijing Rong Rong times Technology Development Co., Ltd.
Chongqing Office
2012.11.8
您可能关注的文档
- 3d期末考试真题(国外英语资料).doc
- 3d灯光(国外英语资料).doc
- 3G梦工厂软件学院介绍(国外英语资料).doc
- 3月安规考试(国外英语资料).doc
- 4-5岁儿童早期教育计划(国外英语资料).doc
- 4.重机373型立式扣夹的装置与应用方法(国外英语资料).doc
- 4000汉字书记口诀(国外英语资料).doc
- 44-西官营镇初中章程(国外英语资料).doc
- 48伏电瓶车充电器原理(国外英语资料).doc
- 48式太极拳谱解读(国外英语资料).doc
- 功能性饮料在2025年运动健康市场推广的健康食品包装设计效果研究报告.docx
- 2025年生物质能生物质炭在化工领域的应用前景研究报告.docx
- 2025年教育培训行业品牌建设与市场推广策略研究报告:教育培训机构品牌形象塑造.docx
- 2025年农村电商市场拓展与乡村振兴战略融合报告.docx
- 聚焦2025:全球化妆品原料可持续发展趋势与挑战分析报告.docx
- 药物市场的最新发展及前景试题及答案.docx
- 聚焦2025:健康生活理念驱动下的体育用品消费市场升级与政策导向.docx
- 传统食品行业2025年数字化转型技术改造案例研究.docx
- 健身平台商业模式创新与用户体验研究报告.docx
- 新能源二手车市场2025年评估体系与流通渠道拓展分析报告.docx
文档评论(0)