北航《技术经济学》在线作业三(第5次)(国外英语资料)
北航《技术经济学》在线作业三(第5次)
BUAA technical economics online homework three
I. judgment questions
1., the starting point of the investment recovery period shall normally be counted from the date of completion of the project investment.
A. error
B. correct
The correct answer: A
2. after tax profit = total profit + income tax
A. error
B. correct
The correct answer: A
3. function analysis is the core of value engineering.
A. error
B. correct
The correct answer: B
4. the research methods of technical economics include systematic analysis, scheme comparison, quantitative analysis and qualitative analysis. ()
A. error
B. correct
The correct answer: B
5. detailed estimation method refers to estimate the amount of liquidity needed for the proposed project by referring to the ratio of operating capital or fixed capital investment or sales income or the total output value of the fixed capital of the same kind of enterprise
A. error
B. correct
The correct answer: A
Two, radio questions
1., value engineering has been popularized and popularized in developed countries.
A. late 60s, early 1850s
B. late 60s, early 1950s
C. late 70s, early 1960s
D. mid 1960s
The correct answer: B
2., there is an investment program, its initial investment of 10000 yuan, the next two years of cash flow is: the first year income of 5500, cost 500, second annual income of 5500, cost 500. Its investment recovery period is ().
A. 2
B. 1.82
C. 0.91
D. 11
The correct answer: A
3., to evaluate the economic efficiency of the project, we should have the financial evaluation of the enterprise and ().
A. enterprise benefit evaluation
B. enterprise risk evaluation
Social evaluation of C. program
D. national economic evaluation
The correct answer: D
4., in order to build a new chemical plant, to the bank loans 50 million yuan, compound interest rate of 5%, the annual interest of 1 times, and at the end of fifth a payment of principal and interest, payable (10000 yuan).
A. 6543
B. 7602
C. 5380
D. 6380
The correct answer:
您可能关注的文档
- 做豆浆要不要先泡豆(国外英语资料).doc
- 做酸奶的方法(国外英语资料).doc
- 停车场规划说明书(国外英语资料).doc
- 健全社会包管轨制(国外英语资料).doc
- 健康生活·新主张--记W乳业新品上市营销推广(国外英语资料).doc
- 健美胸肌训练——飞鸟(国外英语资料).doc
- 儒释道三家实为一家,所谓万法归一(国外英语资料).doc
- 储量计算基本参数设置(国外英语资料).doc
- 儿歌(国外英语资料).doc
- 儿童口才培训资料(国外英语资料).doc
- 2024年01月[广东]农业银行深圳市分行校园招考第二次差额笔试历年参考题库附带答案详解.docx
- 2024年01月[山东]华夏银行临沂分行应届毕业生招考笔试历年参考题库附带答案详解.docx
- 2025至2030年中国冷轧窄钢带行业投资前景及策略咨询报告.docx
- 2025至2030年卧式燃油炉项目投资价值分析报告.docx
- 2025至2030年双层USB母座项目商业计划书.docx
- 2025至2030年大头仔工艺品项目投资价值分析报告.docx
- 2025至2030年工程车空调系统项目投资价值分析报告.docx
- 2025至2030年彩色数码PVC卡基项目投资价值分析报告.docx
- 2025至2030年彩色脚踏卫生桶项目投资价值分析报告.docx
- 2025至2030年并捻机项目商业计划书.docx
文档评论(0)