压缩空气管道安装标准(国外英语资料)
压缩空气管道安装标准
This article is contributed by laural12
DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view.
Standard for installation of compressed air piping and acceptance standards for engineering installation of pneumatic equipment
Refer to GB 5038-2006 as a general rule
Pipes and pipes, pipes and equipment are not to be joined by strong counterparts. Compression rust, welding slag, burrs, oil and water contamination on the surface of the carbon steel pipe should be air before painting, before the test, weld shall be painted carbon steel pipe compressed air pipe welding butt weld should adopt argon arc welding or argon arc welding backing and filling. Compressed air pipe butt weld appearance quality of carbon steel is not allowed to have cracks, porosity, slag, dissolve splash and incomplete penetration: undercut depth is less than 0.5mm, and the total length of the weld seam on both sides of the less than 10% of the full length of the weld, and less than or equal to 1+0.1b (b weld width), and no more than 3mm. Pipe making, pipe cutting and pipe beveling shall be done by mechanical processing. The end face of the notch shall be smooth and the end face should be perpendicular to the axis of the pipe. The deviation shall be 1% of the pipe diameter and shall not be greater than 2.0mm. Pipe welding groove type and size shall comply with the welding operation instruction, and the iron groove, burr and so on shall be removed after the machining of the groove. Pipe bending should meet the following requirements: 1, bending cold bending should be adopted, the minimum bending radius should not be less than
The outer diameter of the pipe is 3 times; the radius of bending shall not be less than 1 times of the outer diameter of the pipe when the stamping elbow is used. 2. The maximum outside diameter and minimum outer diameter after bending shall not exceed 8% of the pipe diamete
您可能关注的文档
最近下载
- 2025年单招四类考试 真题及答案.doc VIP
- JB-TB-TC6165火灾报警控制器安装使用说明书V1.1-天成.pdf
- 深度解析(2026)《GBT 29035-2022柔性石墨填料环试验方法》.pptx VIP
- JB_T 10286-2013 日光温室 技术条件.pdf VIP
- 元认知心理干预技术及应用.ppt VIP
- 2025年河北省单招四类考试试卷真题 .pdf VIP
- 实施指南(2025)《GB_T9877-2008液压传动旋转轴唇形密封圈设计规范》.pptx
- 仪表液位计PPT课件.pptx VIP
- CMC-LX软起动器中文说明书.PDF
- 2025年丽江市特岗教师招聘真题汇编附答案解析.docx VIP
原创力文档

文档评论(0)