- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
变压器弊病剖析(国外英语资料)
变压器故障分析
Ten common faults and faults analysis of frequency converter
1 overcurrent (OC) overcurrent is the most frequent phenomenon of frequency converter alarm. 1.1 phenomenon (1) when restarting, a speed is tripped. This is a very serious overcurrent phenomenon. The main reasons are load short-circuit, mechanical parts are stuck, the inverter module damage, motor torque is too small and so on. (2) power on the jump, this phenomenon can not generally reset, the main reason is the bad module, the drive circuit is bad, the current detection circuit is bad. (3) when restarting, it does not trip immediately, but in acceleration, the main reason is that the setting time of acceleration is too short, the upper limit of current is too small, and the torque compensation (VF) is higher. 1.2 example (1) a LG-IS3-4 3.7kW converter start jump OC analysis and maintenance to open the hood did not find any signs of burning, on-line measurement of IGBT (7MBR25NF-120) the basic judgment is no problem, in order to further determine the problem, the power transistor 7 measurement unit IGBT remove after the opening and the closing are good. When measuring the drive circuit of the half bridge, it is found that there is a distinct difference between the circuit and the other two paths. After careful examination, it is found that an optocoupler A3120 output pin is short circuited with the power supply negative pole. After the replacement, the three circuits are basically the same. The module is loaded with electricity and works well. (2) a BELTRO-VERT 2.2kW frequency converter will jump on OC and cannot be reset. Analysis and maintenance first check the inverter module and find no problems. Then check the driving circuit and no abnormal phenomenon, not in this one estimation problem may be in the current signal processing of this part, the sensor circuit removed after power on, that everything is normal, so that the sensor has been bad, find a new change after all normal load experiment
您可能关注的文档
- 分享三个月内做到二十万外链的方法(国外英语资料).doc
- 分娩前应准备什么?(国外英语资料).doc
- 分享分享 阅读原文(国外英语资料).doc
- 出题表-05植物(国外英语资料).doc
- 分析仪表的配置及选型(国外英语资料).doc
- 分析复习题(国外英语资料).doc
- 函馆(国外英语资料).doc
- 冷干机除湿原理(国外英语资料).doc
- 分析飞力公司战略目标与绩效管理之间的脱节(国外英语资料).doc
- 分离工程论文(国外英语资料).doc
- 小学数学试卷二年级上册期中测试卷(有一套)word版.docx
- 小学数学试卷二年级上册期中测试卷(易错题)word版.docx
- 竞争对手与合作伙伴分析.pptx
- 2025贵州平坝区人力资源和社会保障局招聘公益性岗位人员模拟试卷附答案详解.docx
- 2025广东广州市增城区康园工疗站服务中心招聘3人模拟试卷及参考答案详解.docx
- 5 多彩的花 课件 2025科学一年级下册人教鄂教版.pptx
- 2025河南新乡市新乡县消防救援大队招聘12人考前自测高频考点模拟试题附答案详解.docx
- 2025广东肇庆市怀集县卫生健康局赴高校招聘卫生专业技术人员52人模拟试卷及答案详解一套.docx
- 2025年首都医科大学宣武医院招聘(二)(36人)考前自测高频考点模拟试题及答案详解1套.docx
- 开采技术与条件.pptx
文档评论(0)