建筑施工组织试题及答案(国外英语资料).docVIP

  • 3
  • 0
  • 约2.86万字
  • 约 13页
  • 2017-06-24 发布于河南
  • 举报

建筑施工组织试题及答案(国外英语资料).doc

建筑施工组织试题及答案(国外英语资料)

建筑施工组织试题及答案 This article is contributed by nuanqingcheng DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view. A glossary (4 * 5=20) 1. construction project: also known as the basic construction project refers to a preliminary design or design range, which consists of one or several individual projects, a unified economic accounting, administrative construction to implement the unified management of the unit. 2. construction projects: construction enterprises from construction bidding began until the warranty period, the whole process of completion of the project, is a one-time construction tasks. 3. feasibility study: the technical and economic demonstration of the construction plan, technical scheme and production and management plan before the investment decision of the construction project. 1. raw data: the data of the natural conditions and technical and economic conditions involved in a project are collectively referred to as raw data. 351.: water construction refers to the construction process of all according to a certain time interval in turn into construction, the construction process has been started, after the completion of the construction team, the same construction process to maintain sustained and balanced construction, the construction process as much as possible lap construction organization. 592., parallel construction: refers to many engineering objects at the same time started and completed at the same time a construction organization. 593. Order Construction: refers to the construction organization sequence or construction object, process sequence, one by one construction of a construction organization. The 574. process: the construction object will be divided into the construction process, also known as the process. 635. flow intensity: the amount of work completed in a construction process during a construction period, referred to as the intensi

文档评论(0)

1亿VIP精品文档

相关文档