- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建筑理论(国外英语资料)
建筑理论
Application of grouting technology in controlling shaft water gushing
The use of space, soil particles in drilling through strata injection grout materials pressure equipment will be able to cure the send interface or within the rock fissures, expansion, cementation, curing, in order to reduce the permeability of the formation, enhance the strength of the formation, prevent ground subsidence and deformation of the grouting technology has been more and more widely used in the control in mine shaft. This article embarks from the control principle of grouting technology in mine shaft in the paper introduces the grouting technique in the control of construction scheme and method of mine shaft and construction technology, and the technology and related problems in the application are discussed, the application of grouting technology in shaft water Chung advantage.
Key words: grouting technology; well bore water inflow; application effect
Multiple application of grouting technology has been widely used in construction, concrete in the control of mine shaft has the advantage of obvious now, the qianyingzi mine shaft as an example, we can know more about the grouting technology in control of mine shaft and scientific, better use.
Qianyingzi coal mine auxiliary shaft design net diameter 6.5m, depth 708m, the soil 264m, using freezing method construction; bedrock ground pre grouting construction method by 444m. The inner wall of the surface section has been completed in April 11, 2007 (surface stopping time is April 2nd). The construction of the wellbore is 607.7m to the depth of well, and the water supply in the shaft is about 17m3/h. In order to ensure the safety of construction and improve the working conditions of the underground working face, the construction of shaft excavation was suspended in October 15, 2007 and converted into the post grouting of the bedrock section and the grouting between the surface soil and the wall.
Two, construction process
1. Layout of
文档评论(0)