- 1、本文档共4页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
施工工序(国外英语资料)
施工工序
Two, the construction requirements (a) material requirements 1, the construction unit of the construction materials of cement, clay brick, clay brick, clay brick, high hole aerated concrete block masonry, must carry out inspection and approval procedures, supervision company checks, prohibited unqualified materials into the construction site. 2, aerated concrete block is cement gel strength to 28 days as the standard of design strength reinforced bulk, and before the age of 28 days did not reach the bulk itself, shrink rapidly. In order to avoid shrinkage cracks and ensure the quality of masonry, the aerated concrete block must reach 28 days old. (two) masonry requirements 1. The foundation walls in contact with the soil must be made of clay solid bricks. No clay big hole brick or clay porous brick shall be strictly prohibited. 2, in accordance with the requirements of the mandatory provisions of the Ministry of construction, the bathroom wall must be cast height greater than 200mm, more than C20 concrete label on the ridge. 3, other parts of infilled masonry wall, the bottom should be building height of more than 200mm of clay solid brick or precast concrete block. 4, fill masonry wall, clay hollow brick brick hole should ensure that the level of porous clay brick masonry, brick masonry should ensure the vertical hole; clay brick, clay brick, clay brick masonry in the big hole must use the day before the water soaked, aerated concrete block suitable amount of water in the surface of masonry masonry. 5, infilled masonry mortar must be strictly in accordance with the weight ratio of measurement preparation, with the mix with the use, the normal temperature finished within 4 hours, if the temperature is above 30 degrees must be finished within 3 hours, prohibited the use of overnight mortar. Infilled masonry should be double thread, staggered a brick, no seams, aerated concrete block lap length should be greater than the length of the 1/3 block, the clay hollow
文档评论(0)