- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
汽轮机强制冷却(国外英语资料)
汽轮机强制冷却
The turbine forced the cooling.Txt-// selfish, so that we only see ourselves, but no one else. If you send text messages to someone you like, he doesnt return it. Dont give it back. Looking at your photos, I would like to think of P as black and white hanging on the wall. Sometimes, the world is not too hypocritical, but we are too naive. Forced cooling of steam turbine
The large capacity steam turbine has large heat capacity and good thermal insulation performance. It has a long cooling time after shutdown. For Pingwei Power Plant MW unit 600, specified by the manufacturer after the shutdown, when the high pressure cylinder head metal temperature dropped to 149 degrees. The 204 party can stop turning and lubricating oil system operation and maintenance unit. In the actual operation, when the unit shutdown accidents in general, primary metal temperature at 430-450 degrees Celsius, natural cooling to 180 DEG 210-230h to stop turning and lubricating oil system. If you take the first metal slide down the parameters. The lowest temperature can drop to 290-300 degrees Celsius, natural cooling to 180 DEG C stopped turning and lubricating oil system, still need to be 120-13Oh, and the sliding parameter shutdown, need to consume many oil combustion boiler, increase the consumption of fuel power plant. After cooling down, the metal temperature in the cylinder drops, the speed is usually 0.75-1 degrees centigrade, so that the unit maintenance time limit is prolonged, and the unit availability coefficient is reduced. Shortening the cooling time after turbine shutdown has become an urgent task. To this end, Pingwei Power Plant and Southeast University cooperation, set up compulsory turbine fast cooling system.
At present, the rapid cooling of turbine used at home and abroad is mainly divided into two categories, steam cooling and air cooling. Because the air specific heat is small, only 1/10 -l/20 forced convection heat transfer coefficient and flow of superheated stea
您可能关注的文档
- 日常睡觉的基本常识(国外英语资料).doc
- 日常生活小常识(国外英语资料).doc
- 日常英语(国外英语资料).doc
- 日本不二越叶片泵(国外英语资料).doc
- 日本文化(国外英语资料).doc
- 日本动漫业化英文(国外英语资料).doc
- 日本东京成田国际机场修两条跑道用往了44年(国外英语资料).doc
- 日本物流发展及对中国的启发(国外英语资料).doc
- 日本进口配件品牌简称(国外英语资料).doc
- 日本概况有关知识(国外英语资料).doc
- 2023咸阳职业技术学院招聘笔试真题参考答案详解.docx
- 2023四川化工职业技术学院招聘笔试真题及参考答案详解.docx
- 2023哈尔滨职业技术学院招聘笔试真题及参考答案详解.docx
- 2023商洛职业技术学院招聘笔试真题及答案详解1套.docx
- 2023呼伦贝尔职业技术学院招聘笔试真题参考答案详解.docx
- 2023南阳农业职业学院招聘笔试真题参考答案详解.docx
- 2023天津公安警官职业学院招聘笔试真题带答案详解.docx
- 2023年上海电机学院招聘笔试真题参考答案详解.docx
- 2023年四川艺术职业学院招聘笔试真题参考答案详解.docx
- 2023安徽体育运动职业技术学院招聘笔试真题及答案详解一套.docx
文档评论(0)