- 1、本文档共11页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
电缆桥架安装注意事项(国外英语资料)
电缆桥架安装注意事项
Cable tray installation notice.Txt, when you think you have nothing, you have at least time, time can heal all wounds, so please dont cry. A contented expectation is worth a wait; a willing hope is worth a fall. The secret to staying young is having a restless heart. It is not the quality of life that determines what tastes, but the quality that determines what life is. Notes on installation of cable tray
1 、 the maximum load of the new alloy plastic cable tray equipment, the support spacing should be less than the allowable load and span.
2, the selection of cable bridge width should have some spare space, in order to add cable for future use.
3, when the power cable and control cable quantity is less, can use unified cable bridge installation, but in the middle to use partition board will
Power cables and control cables are separated and laid out. If necessary, a shielded bridge shall be combined with a common bridge.
4 when the cable bridge is horizontally laid, the joints between the bridges shall be located at the 1/4 of the span as far as possible, and the bridge with the horizontal direction shall be located as far as possible
Stand at about 2 meters high fixed boom one, the vertical direction of the bridge every 1.5 meters or so fixed one.
5, shield cable bridge installation should be equipped with protective cover, bridge in outdoor installation, the top should also be equipped with protective cover, prevent sun and rain. A device in substation (or power plant) including directly with production and distribution to related equipment for a device: generator transformer, isolating switch, transformer, power capacitor, reactor, busbar, lightning arrester, transmission lines, etc..
H E$a$D (D (n), v4CP3J0, connected by a primary device, is called a primary system. ZG power automation bGUw*t|K^
Two equipment of an electrical equipment for measurement, control, monitoring, control and protection of the auxiliary equipment, including: various relays, s
您可能关注的文档
- 深圳东森考场科目三考试步骤(国外英语资料).doc
- 液晶电视秘籍(国外英语资料).doc
- 深圳各海关特色(国外英语资料).doc
- 深圳外贸批发市场总汇(国外英语资料).doc
- 深圳市金铭实业有限公司(国外英语资料).doc
- 深圳热转印的数字制版处理(国外英语资料).doc
- 混凝土在现代修建施工中的应用剖析编辑(国外英语资料).doc
- 深海鱼油的介绍(国外英语资料).doc
- 混凝土夏季施工(国外英语资料).doc
- 混凝土技术交底(国外英语资料).doc
- 2025云南省保山市消防救援支队招聘财务人员(1人)笔试备考试题及答案解析.docx
- 四川省人大常委会办公厅直属事业单位2025年公开选调工作人员(2人)笔试备考试题及答案解析.docx
- 成都航空新城建设发展有限公司社会公开招聘笔试备考题库及答案解析.docx
- 2025浙江宁波象山县机关事业单位第六批招聘派遣制驾驶员3人笔试备考题库及答案解析.docx
- 2025年四川省林业和草原局直属事业单位公开选调工作人员8人笔试备考题库及答案解析.docx
- 西昌学院2025年直接考核招聘工作人员(45人)笔试备考题库及答案解析.docx
- 2025重庆永川区外选调教师42人笔试备考题库及答案解析.docx
- 2025龙门实验室招聘2人【至5.19】笔试备考题库及答案解析.docx
- 2025年四川省眉山第一中学教师招聘笔试备考试题及答案解析.docx
- 成都理工大学2025年公开选调工作人员(11人)笔试备考试题及答案解析.docx
最近下载
- 渤海稠油油田聚合物驱高效开采技术.doc
- 重症患者的早期康复课件.pptx
- 中国南方电网公司招聘笔试题库2025.pdf
- 电气工程基础课程设计报告-110kV变电站电气系统初步设计.doc
- 化工常用阀门介绍.doc VIP
- 新仁爱科普2024版英语七年级上册Unit 1 Let's be friends大单元整体教学设计.docx
- 高考数学五年(2020-2024)真题《空间向量与立体几何(解答题)》分类汇编.docx
- 香港街头最不缺的就是美女,来自世界各地.pdf VIP
- 高考数学五年(2020-2024)真题《空间向量与立体几何》分类汇编.docx
- 2024年考务人员培训系统考试参考答案.docx VIP
文档评论(0)