- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
管路改造工程的施工工艺(国外英语资料)
管路改造工程的施工工艺
Construction technology of.Txt pipeline project is late at night, because the courage to end the day; stay in bed because of the courage to start the day. A friend is someone who can see through you and like you. Construction technology of pipeline reconstruction project
Release time: 2010-11-16 belongs to category: decoration process
(1) construction process flow;
Put holes in the pre dug pipe, pipe scale blanking, pipe threading, pipeline installation bracket, embedded embedded parts, pre inspection, formal connection and installation.
(two) the construction of A.
The connection of the pipeline is usually made by means of thread connection.
We should be based on the design requirements of pipeline transformation, in the center position of the wall marked wall holes, marked by the cross line on the wall, with percussion drill holes, holes in the center line should be consistent with the center line of the pipeline wall, should be a measure of straight.
The pipe cover wire is the key link to guarantee the installation quality.
Before the pipe is installed, the pipe should be cleaned so as to make it clean and free of debris. When installed, pay attention to the quality of interface, and identify the location and direction of shuaitou control to ensure that the installation after connecting the water equipment in the correct position.
After the installation of the pipeline, the pipeline should be cleaned and coated with anti-corrosion paint.
(three) galvanized pipe laying and installation method;
(1) the pipeline wall concealed wall, the groove depth and width should not be less than the outer diameter of the pipe and 20mm pipe pressure test after application of 1:3 cement mortar filling compacting groove.
(2) the concealed application of the pipeline in the ground surface layer or the hanging flat roof shall be done after the test pressure is qualified and the acceptance work of concealed works shall be done.
(3) the pipe with a single cold pipe shall b
文档评论(0)