网站大量收购独家精品文档,联系QQ:2885784924

箱梁节段预制与拼装施工监理(国外英语资料).doc

箱梁节段预制与拼装施工监理(国外英语资料).doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
箱梁节段预制与拼装施工监理(国外英语资料)

箱梁节段预制与拼装施工监理 Construction supervision of precast and assembled section of box girder [Abstract] combining with the prefabrication and assembling technology of the box girder section of Sutong and Jimei bridge in our company, this paper briefly introduces the main points of construction supervision, and puts forward some experiences and suggestions. Key words: box girder segment prefabrication and assembly; supervision control points; experience and suggestions 1 project overview Sutong Bridge B2, D1 and Jimei bridge C4 standard, the upper structure of prestressed concrete continuous box girder, the use of short-term matching method of prefabricated, TP75 type bridge erection machine. The Sutong Bridge B2, D1 standard superstructure with the left and right two deck layout, wide 34.0m, high beam 3M, span 75m box girder segment length is divided into 2m, 3M, 3.3m, 3.5m, 3.6m, 4.0m and 4.5m seven, section 84.6 ~ 287.6t. The upper structure of C4 bridge of Jimei bridge adopts left span road bridge, BRT bridge and right width road bridge three, The main bridge with variable cross section continuous box girder span is 55+2 * 100m+55m, deck width 12.75m, cross section of 3M beam, the fulcrum beam height 6m, the length of each segment is divided into 1.7m, 3.85M, 4m, 4.7m, 5.4m five, section 66 ~ 220t. The approach beam height is 3M, the span is 50m, and the section length is divided into 2m, 3.23M, 3.27M, 3.5m, 3.7m and 3.75m, and the weight of segmental box girder is 55 to 180t, and the span length is. Key points of construction supervision of 2 section box girder Precast 2.1 section box girder 2.1.1 template system security (1) the steel formwork should be designed and manufactured by professional units (Singapore YWL company), which requires the formwork to have the advantages of large rigidity, good stability and high accuracy. (2) release agent by Italy sika, when used in 25m2/Kg for brushing, brushing the template surface should be cleaned up. (3) the template syste

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档