土建工地资料员做的全套资料及流程(国外英语资料).doc

土建工地资料员做的全套资料及流程(国外英语资料).doc

  1. 1、本文档共20页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
土建工地资料员做的全套资料及流程(国外英语资料)

土建工地资料员做的全套资料及流程(国外英语资料) The sequence of engineering data of construction engineering units Part A: A (1) construction management data (construction and construction) Prior to the construction of the organization, there should be construction organization design: the main projects are the general situation and the characteristics, the guiding ideas and the construction phase of the project construction arrangement; Construction arrangement, construction sequence and total project progress (network plan); Major construction methods and quality assurance measures; The amount of labor used; Construction machinery, materials, semi-finished products and the use of quantity planning and transportation plans; Large temporary facilities planning; Construction preparation work plan; Security measures; Floor plan for construction; The quality system; Security systems, etc. 2, engineering before construction, the construction unit to organize the construction units, design units, prospecting units, supervision units familiar with drawings, for, the blue prints.the design form the record of the blue prints.the design. Technical background: sub-level 3. At the first level, the chief engineer or the chief engineer of the construction unit shall carry out the technical information for the construction of the construction plan of the construction project of the construction team or the construction project of the construction unit; Secondary disclosure for construction group or work area to unit project leader (project manager), director of personnel, quality inspectors, safety personnel and related functions of technical disclosure; At the end of the third grade, the principal engineer of the unit project or the engineer of the technical engineer shall be responsible for the technical intercourse between the team leader and the workers. In case of the progress of the project, the design changes shall be collected, and the units and construction units shall sign and stamp seals. Th

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档