- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
施工队一般工价参考(国外英语资料)
施工队一般工价参考(国外英语资料)
The construction team is usually paid for reference to the construction team at 9:09-29 21:53
The wages of construction group around is different, even in the same city, construction crews from fixed place their wages is different also, like all come from foreign workers in demand, relatively speaking, from guangdong ranks the highest wages, followed by the jiangsu and zhejiang area team, the wages of below give you a reference.
The reference price of the serial number item is specified
A demolition engineering
1 remove steel doors and Windows (single, double fans) 1000
Remove steel doors and Windows (3, 4 fans)
Remove the steel doors and Windows (four above) and the high level of the high building at 30.00
Remove the wooden door window fan 4.00
Remove wooden doors and Windows for 10 years
6 M214.00 dismantle 1 brick wall
Remove 1/2 brick wall M26.00
It is difficult to divide the floor tile and the wall tile
Remove ceiling and joists ceiling M25.00
Remove M2.00 of white iron pipe
The bath crock is only 25.00
Removing the toilet seat is only 15.00
Remove the basin only 5.00
Remove the bucket only 8.00
It is difficult to eliminate the difficulty of painting M22.50
Remove the ceiling painting M24.00
Second build by laying bricks or stones powder
1 brick wall M215.00 17 new build by laying bricks or stones
New building 1/2 brick wall M210.00
New construction of 1/4 brick wall M27.00
New brick wall M216.00
New plasterboard partition (double-sided) M215.00
New powder wall (powder light) M28.00
23 new powder flat-topped M210.00
Floor level M26.00
The chalk line is 50.00
Floor tile M216.00 includes scratchy base
The wall tile M218.00 includes scratchy base
The ground is paved with granite and marble M230.00
Spread granite and marble baseboard M6.00
Three condole carries on the project
30 paper plasterboard (flat) M225.00
Additional discussion of the M230.00 special shape of the plasterboard platform
32 plastic gusset ceiling M215.00 includes wooden floor
3