- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
混凝土浇筑方案 及注意事项(国外英语资料)
混凝土浇筑方案 及注意事项(国外英语资料)
The concrete pump USES maintenance points
Concrete pump truck has been used in the construction of concrete pouring, the advancement and the maintenance of the equipment technical complexity, determines the use, maintenance and management of it staff to put forward higher requirements. In order to ensure the concrete pump truck at work can meet the technical condition, reduce the maintenance cost, improve the use of reliability and life expectancy, must seriously implement the use of maintenance procedures.
First, safety procedures
In order to ensure the safety of the concrete pump operation and avoid causing personal or equipment accidents, the following safety procedures must be strictly observed.
Venue selection. Avoid obstacles such as high pressure lines as far as possible.
Check before homework. The power switch should be in the off position. The concrete displacement handle and the mixing device shall be in the middle position.
Step 3. The concrete pump should be placed horizontally, the ground should be flat and firm, and the working process will not be sunken. The leg stabilizes the whole machine reliably and securely.
Arm bracket operation. When the arms are stretched or repossessed by folded states, they must be carried out in the prescribed order. The rotary operation of the arm frame must be carried out after the arm frame is completely off the bracket. The arm frame shall not be used when the storm or wind is above 8 or above (wind speed 16 ~ 17m/s). Arm frame must not be used for lifting.
Pump delivery. When the pump is started or stopped, contact the operator at the end hose. The curved radius of the end hose shall not be less than 1m and not bending; Before disassembling the pipe, the pump should be pump 2 ~ 3 times before removing the remaining pressure in the pipe.
Check after homework. The arm frame should be fully recovered from the arm frame. The legs should also be fully recovered and inserted into the lock pin. The power
您可能关注的文档
最近下载
- 《七律二首 送瘟神》-中职语文高二同步课件精选(高教版2023·职业模块).pptx VIP
- 高考蓝皮书·物理试题分析2025.docx VIP
- 综合实践活动 开学第一课 2024-2025学年综合实践活动开学第一课课件.pptx VIP
- 高标准农田监理大纲方案投标文件(技术方案).doc
- 小儿过敏性休克抢救流程.pptx VIP
- 液压与气压传动技术完整整套教学课件.pdf VIP
- 技术标投标文件监理大纲.doc VIP
- 2025 年成都市三年级数学秋季开学摸底考 - 冲刺卷及答案(北师大版).docx VIP
- 最新2025年《初中初三开学第一课》全文.pptx VIP
- 姓氏的由来演讲课件(张姓).pptx VIP
文档评论(0)