- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
精馏塔开停车步骤(外国英语资料)
精馏塔开停车步骤(国外英语资料)
Rectification tower opening and stopping steps
Driving is a very important part of production, the goal is to shorten the time to drive, save costs, avoid possible accidents, as soon as possible to obtain qualified products. Parking is also very important in the production process, when the device is operating after a certain period, equipment and instrument will have a variety of problems, continue to maintain production in terms of production capacity and raw material consumption has not reached the requirements of the economic and reasonable, but also contains the accident potential dangers, so the need for parking overhaul, to the device is completely stop as soon as possible into the maintenance phase, must be ready to stop working, making the parking step reasonable, to prevent a variety of possible problems.
General steps of opening and stopping
The general steps of distillation column driving include the following steps:
(a) develop reasonable driving procedures, schedules and necessary precautions; prepare the necessary raw materials and utilities; provide staffing and complete training accordingly.
B) at this time, the structure of the tower must meet the design requirements, the tower is neat, no solid debris, no clogging, and should not have to remove all the substances, such as oxygen and moisture content in the tower must comply with the requirements of pumps and instruments; normal debugging; safety measures have been adjusted.
C) press and decompress the tower to achieve normal operating pressure.
D) heat and cool the tower to its operating temperature.
E) adding raw materials to the tower.
(f) open the overhead condenser and the heat source for the reboiler and various heaters, and the cold sources of various coolers.
G) adjust the operating conditions and parameters of the tower gradually, so that the load of the tower and the quality of the product will gradually reach the normal operation value as soon as possible and turn to no