- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
我的东西(国外英文资料)
我的东西(国外英文资料)
Rock drilling, the bottom of the hole to improve the mud weight and the amount of the hole bottom slurry by general drilling waste slag into supporting buoyancy bond force, the rock drill under the impact of wrapped in mud, to reduce duplication of broken rock. During construction, clay, impact and slag are repeatedly thrown to increase drilling speed. Water head control is generally higher than the ground water level or about 1.5m of the river. The method of timely filling slurry, pumping slurry and cutting slag always keeps the fixed height difference of 1.5m with the water outside the hole to ensure the stability of the water pressure in the hole and the safety of the hole wall.
(3) reinforced cage system
After completion of the completion of the hole, the inspection hole depth, aperture and vertical inspection meet the requirements, that is, reinforcement cage construction.
The steel cage is centrally assembled on the shore, and a special person is responsible for ensuring the geometric size and strapping quality of the steel reinforcement. In order to ensure that the carriage is not deformed during the carriage, the steel cage is strengthened with cross support. The steel cage is lifted into the hole by a crane, and the length of the weld is welded at the orifice and keeps the upper and lower sections on an axis. When the steel cage falls to the designed elevation, the hanger is firmly connected with the protecting cylinder or platform to prevent the cage from falling out or floating.
The reinforcement cage should be installed carefully to ensure that the thickness of the concrete wall of the pile wall and the elevation of the reinforcing cage meet the design requirements. After the steel cage is installed, two cleaning holes are carried out. After cleaning, the slurry performance indicator shall be reported to the site supervision engineer for acceptance.
3) the construction plan of automobile crane installation beam plate
(1) preparation;
The si
您可能关注的文档
- 家庭用具公司绿颜色营销的战略途径(国外英文资料).doc
- 家教同人_备注(国外英文资料).doc
- 家电维修论文(国外英文资料).doc
- 家装吊顶的选择(国外英文资料).doc
- 家装施工工序(国外英文资料).doc
- 家装规格(国外英文资料).doc
- 容易读错的字一览表1(国外英文资料).doc
- 家庭酿制葡萄酒(国外英文资料).doc
- 容易读错的常用字字表(国外英文资料).doc
- 家装尺寸(国外英文资料).doc
- 戏说高温气体分析仪,大大轻拍~(国外英文资料).doc
- 房产测量规范(部分)(国外英文资料).doc
- 房产测量问答(国外英文资料).doc
- 房地产“双限”令(国外英文资料).doc
- 成都代评职称代评高级职称代评中级职称评定条件及专业(国外英文资料).doc
- 房地产企业岗位招聘笔试题题库之三十八(含答案):土建造价工程师(国外英文资料).doc
- 房地产开发项目行政审批流程(国外英文资料).doc
- 房地产培训【青岛】解密龙湖—项目工程全程精细化管理与经验借鉴(7月12日)(国外英文资料).doc
- 戴尔电脑一些简单检测方法,报修前可以看看,加快报修速度(国外英文资料).doc
- 房地产销售讲解技巧(国外英文资料).doc
最近下载
- 2024-2025学年四川省成都市第七中学高一(上)月考物理试卷(10月)(含答案).docx VIP
- 育婴员职业守则课件.pptx VIP
- 蔬菜生产技术课程标准.docx VIP
- 2025中考语文现代文阅读总复习-第1部分 专题12:记叙文阅读之主旨把握(讲义)(教师版).docx VIP
- 硅铁冶炼培训课件.pptx VIP
- 水土保持工程监理规划.pdf VIP
- 政务云平台 第4部分:系统部署和迁移要求_地方标准编制说明.pdf
- DB37T-政务云平台监管指标体系及编制说明.pdf VIP
- 高中物理必修二第一章检试测卷.doc VIP
- DB37T 4394.4—2024政务云平台 第4部分:系统部署和迁移要求.pdf VIP
文档评论(0)