- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
房屋建筑部分工程验收(国外英文资料)
房屋建筑部分工程验收(国外英文资料)
This article is contributed by lyblyj9510
DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view.
Table 1
Application form for final acceptance of works
Did test report name of project construction unit reconnaissance unit design unit supervision unit construction unit project completed the engineering design and the contract technical archives and construction management information mainly construction materials, fittings and equipment (including inspection station) the implementation of rectification problem quality warranty supervision information construction engineering safety evaluation book the payment of the project has been completed and the contract agreed to the content of the design, the quality of the project comply with the relevant laws, regulations and mandatory standards for construction, special application for the project completion and acceptance procedures. Project Manager: enterprise technology leader: (construction unit seal) legal representative: Date: engineering supervision units opinion type / address structure layer construction area of the commencement date date of completion date of the contract the construction unit self inspection
Conditions for completion of the project are in good order
Signature of chief engineer:
year
Construction Department of Guangdong Province on September and August
Schedule two
Departmental engineering quality evaluation sheet
Project Name: name of the serial number engineering construction unit: the number of the number of excellent remarks
One
Two
Three
Four
Five
Six
Seven
......
close
meter
Excellent rate
%
From project leader: evaluation of year, day, technical leader:
Chief engineer, chief engineer of Guangdong provincial construction department:
Schedule three
Quality assurance data sheet
(buildeings) project name Project No. 1234 building 56 building 78 910 1112131415 heating gas engineeri
您可能关注的文档
最近下载
- 写给班主任的三十条建议.docx VIP
- 核反应堆设计软件:RELAP5二次开发_(17).RELAP5接口开发与数据交换.docx VIP
- 3.1网络改变世界 课件 2025-2026学年统编版道德与法治八年级上册.pptx VIP
- 三维超声评价子宫内膜容受性.pdf VIP
- 公基础知识(陕西省省情).pdf VIP
- (2025秋新版)二年级上册道德与法治全册教案.docx
- Viaton外研通单词机VT-D10使用指南.pdf
- 学校超市经营方案(完整).doc VIP
- 2024年秋季人教版七年级上册语文全册教学课件(考点精讲版).pptx
- 成都盒马鲜生末端物流配送管理与路径优化研究.doc VIP
文档评论(0)