结构师11年专业试题(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
结构师11年专业试题(国外英文资料)

结构师11年专业试题(国外英文资料) 1., a high-rise building requires a large floor at the bottom of a large space, the system should be used at this time: [D] A frame structure B plate column structure C shear wall structure D frame supported shear wall Shockproof seam is arranged between 2. tall buildings or units of the main building and the podium, the following which is correct? [A] A no reliable measures should not adopt the bracket joist approach B should not be used in the practice of the bracket joist C adopts the bracket joist approach, but the connection structure should be reliable D adopts the bracket joist approach, but should press the hinged support structure 3. building the same height of the high-rise buildings at the following locations, where the wind is the largest (A) A was built on the coast B is built on the outskirts of a big city C was built in a small town D is built in a large urban area with dense buildings 4., the height of the building two buildings, building seismic fortification category and the importance of site category are the same, is a framework structure, the other is a frame shear wall structure, the frame seismic level of these two kinds of structure in the system which is right? [C] A must be equal B the latter has a high seismic rating C the seismic resistance of the former is high and may be equal D is not sure 5., the structure of high-rise building shock joint setting, which of the following is correct? [B] A shall be provided along the full height of the house, including the foundation, and shall also be disconnected The B shall be installed along the full height of the house, and the foundation shall be secured without seismic connections, but the construction and connection shall be strengthened in conjunction with the upper shock joint C should be set along the full height of the house, with the basement only above the ground D along the full height set foundation for independent pile underground part can be shockproof seam, can als

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档