- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
给水排水设计过程与方法——新手必读(国外英文资料)
给水排水设计过程与方法——新手必读(国外英文资料)
Water supply and drainage design process and methods - novice must read
Release time: 2012-08-08 10:20:28
Just for building drainage design to engage the novice often only know to check the specification to draw, and for a project how to start, how to improve the professional information collaboration ~ until completion and acceptance, and without a clear understanding. In order to let everyone faster into the role of designers, the forum Heroes (Fairy Tales) articles collected for this article.
The content of this paper includes two parts: process introduction and design example.
The process is divided into the design stage (project proposal, feasibility study report, preliminary design and construction drawing design - - construction plan review, review, review of the civil air defense fire) and construction stage (drawings, site - Acceptance). Examples include scheme design, initial expansion design and road water supply and drainage design.
I. work phase division
1, design stage:
Project proposal - feasibility study report - preliminary design (preliminary design) - construction drawing design - construction drawing review, fire review, air defense review.
2, construction stage
Drawings: site - acceptance.
Two 、 design workflow
Construction drawing according to the following nine steps, according to the situation may also cross:
1. Call each professional meeting to determine the timing of each others funding, list work plans, and provide floor, elevation, and sectional profiles to the building designer. Water professional investment should be divided into 3 stages, the first stage of well location, area, capacity, volume, equipment room area, usually within a week; second stage equipment room layout, fire hydrant, wet alarm valve, water flow indicator position, generally in early time, about 2 ~ 3 week;
In the third stage, the equipment and materials should be submitted to the budget estimate, usually one week before the drawing. Other
您可能关注的文档
最近下载
- 《新时代职业英语》教学资源_传媒英语_Unit_6_.pptx VIP
- 中医临床执业医师考试题及答案2025版.docx VIP
- 超声中信号处理.ppt VIP
- 《新时代职业英语》教学资源_传媒英语_Unit_7_.pptx VIP
- 部编人教版道德与法治五年级上册《全册课件》.pptx
- 《新时代职业英语》教学资源_传媒英语_Unit_9.pptx VIP
- 宝钢质量管理经验.doc VIP
- 勿忘历史,珍爱和平——抗战胜利80周年主题班会-2025-2026学年初中主题班会优质课件.pptx VIP
- Kuka控制系统 KR C5安装指南.pdf VIP
- 学习2025年《初中初三开学第一课》.pptx VIP
文档评论(0)