section 22 11 24 – municipal pacakged pump .doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
section 22 11 24 – municipal pacakged pump

SECTION 22 11 24 – MUNICIPAL PACKAGED PUMP SYSTEMS PART 1 - GENERAL 2 1.01 WORK INCLUDED 2 1.02 RELATED SECTIONS 2 1.03 MANUFACTURER 2 1.04 QUALITY ASSURANCE / REFERANCE STANDARDS 3 1.05 WARRANTY 4 PART 2 - PRODUCTS 5 2.01 PERFORMANCE AND DESIGN REQUIREMENTS 5 2.02 MECHANICAL 5 2.03 PUMPS AND MOTORS 13 2.04 OPTIONAL SKID UPGRADES 20 2.05 ELECTRICAL 22 2.06 SEQUENCE OF OPERATION 28 2.07 EQUIPMENT ENCLOSURE UPGRADE 29 2.08 MODULAR STRUCTURE ENCLOSURE OPTIONS 47 PART 3 - EXECUTION 52 3.01 INSTALLATION, STARTUP CUSTOMER TRAINING 52 ATTACHMENT A – TECHNICAL DATA SHEET 55 SECTION 22 11 24 – MUNICIPAL PACKAGED PUMP SYSTEMS - GENERAL WORK INCLUDED This Section covers work by the Contractor to furnish, install, test and make ready for operation a Booster Pumping system. The equipment furnished includes pumps, motors, pump controls, manifolds, piping, valves, gauges, electric controls, and all related appurtenances, including skid, to complete a booster pumping system. Pump system manufacturer shall provide a UL listed, single source responsibility for the manufacture, warranty, service and operation of a prefabricated, skid-mounted, fully automatic pumping system. The pumping system shall conform to the following specifications in all respects. This specification covers the minimum requirements; however, it should not be construed as all inclusive. It is the manufacturer’s responsibility to include all necessary appurtenances to provide for a complete, fully automatic and reliable pumping system. The manufacturer shall supply a complete set of general arrangement drawings, electrical power schematics, and control schematics in the Installation, Operation Maintenance Manual. RELATED SECTIONS (Insert Related Spec Section List Here) MANUFACTURER The pumping system shall be of the type manufactured by Metron, Inc. Denver, Colorado, U.S.A., (303) 592-1903, or pre-approved equal, approved by the engineer prior to the bid opening. For consideration of a proposed equal syst

文档评论(0)

kunpengchaoyue + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档