- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
《铁路技术管理规程》普速版 第十六章 2014.7(国外英文)
《铁路技术管理规程》普速版 第十六章 2014.7(国外英文资料)
Sixteenth chapter fixed signal
Color light signal
The 415th stop color signal displays the following signal:
1., three display automatic block, semi-automatic block, automatic block between station color signal station
(1) a green light - required to allow trains speed by line through the station express station and route signal in the open state, on the road were opened straight to the position switch (as shown in Figure twenty-sixth (P255));
(2) a green light and a yellow light allow the train to go straight through the switch, enter the station and pass over an already open signal, ready for parking (as shown in Figure twenty-seventh); (P255)
(3) a yellow light, to train turnout straight position, enter the station line for parking (as shown in Figure twenty-eighth (P255));
(4) a yellow flash and a yellow light, allowing the train No. 18 turnouts and above the lateral position, enter the station over a time signal has been open and the signal protection approach by turnout straight to 18 and above the switch position or lateral position (as shown in Figure twenty-ninth (;) P255)
(5) two yellow lights - - allowing the train to pass through the lateral position of the switch (but not to meet condition (4) above), to enter the station and prepare for the parking (as shown in Figure thirtieth); (P255)
(6) a red light - no train crossing the signal (as shown in Figure thirty-first). (P255)
2., four shows the automatic block section color signal
(1) a green light, allowing the train to enter or pass through the station at the prescribed speed, indicating that there are at least three blocked partitions at the front of the train, as shown in figure twenty-sixth;
(2) a green light and a yellow light, required to allow trains speed switch straight position into the station, said a signal switch by straight position to open a yellow light (as shown in Figure twenty-seventh (P255));
(3) a yellow light - to train according to the speed limit
原创力文档


文档评论(0)