市政类二级建筑师模拟题(国外英语).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
市政类二级建筑师模拟题(国外英语)

市政类二级建筑师模拟题(国外英语资料) (a) The structure of the road structure is: 7cm asphalt concrete pavement, 15cm thick cement stable gravel, 15cm thick and 12% lime stable soil, 15cm thick and 8 per cent lime improve soil cushion layer. The excavation depth is within 0.2 ~ 1m. The construction period is during the rain period. According to the scene (1), answer the following questions: The appropriate way to do this is (). A must be excavated according to the center line of the measuring and the side pile, and the average length of each side is 300 ~ 500mm B: no, no, no, no, no, no, no The C roller is not less than 8t roller D cross street rainwater pipe should be run after roller compaction Answer: A, In the compaction of the subsoil compaction, the soil moisture content reaches () the compacted effect is the best. A liquidity limit B the best water content C saturation water content D plastic limit Answer: B 3, the mud stabilizes the gravel from start to add water to completely compacted delay time, usually not exceed () A3h B5h C6h D3 ~ 4 h. Answer: D When the engineering surface layer is pressed, it is strictly forbidden to brush or spray () on the wheel. A mixed detergent water B diesel C isolation agent D anti-sticking agent Answer: B In the column option, the measures for the construction of the road base rain are () A day is finished, finished, compacted, left behind B how much, how much, how much, how much C does not allow the construction of the lower layer wet, in time to spread out and finish the compaction D build a movable tent at the site so that it can continue when it rains Answer: A, (2) The construction of a municipal overpass project is based on the cast-in-place pile, the eight prismatic pier, and the upper structure is the prestressed concrete box girder with the cross-diameter 25m. The pile foundation is mainly through gravel soil (less than 20% gravel, which is more than two-thirds of the diameter of the drill pipe). The project is subcontracted to the pr

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档