工程预结算中最容易忽略的项目名称(外国英语资料)

工程预结算中最容易忽略的项目名称 The collected works budget or the 100 places in the settlement are easy to leak. See if you missed it. 1. The steam holes in the roof insulation roof of flat roof 2. The embedded iron parts in the stair railing 3, paint, paint construction scaffolding 4, precast slab beam concrete: plate beam head concrete, transportation, installation 5, bored piles: drilling depth into the rock (the project Municipal and highway quota project contains a large gap in content) 6, the installation of indoor plumbing is easy to miss 7. Extra high cost of outdoor pipe installation 8, the install