- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
如何成为一个六西格玛公司汇编
* Okay, now we are going back into the language of numbers and mathematics. We are going to now introduce the concept and define Process capability Ratios. Process capability ratios have been around a long time and are predominately used in the manufacturing portion of our business. There are two statistics The first is Cp which compares the width of the data set variation to the width of the spec The second is Cpk is the MINIMUM calculated value of comparing the mean and standard deviation to the upper and lower specification values * Getting a little more detailed, the Cp is looking at the process and spec width. It assumes the process mean is aligned with the spec target. ASK THE CLASS: We discussed a while ago the attributes of Precision and Accuracy, Cp is quantifying what attribute? ANSWER: Precision The industry standard for Cp is 1 the Six Sigma goal is 2 * Cpk is the calculated value that will provide the lowest value. Case in point the figure provides a example . The distribution is shifted to the left of the target value. We can see the area to the left of the LSL is much greater than the area to the right of the USL. Therefore the lower Cpk value will be used for the LSL value. Cpk is the more robust ratio because it uses the mean, standard deviation, and the specification width. It provides a better indicator for process capability. A Cpk of less than 1 is considered poor A process exhibiting a Cpk of 1.5 for short term data is our target. A value of 2.0 sustained over the long term should initiate an action to remove the measurement. * Now let’s look at A process capability ratio table. The table compare Z score, Cp, and Cpk. Note that Z= 3*Cp. The capability ratios are then align with the Defects in PPM. The two PPM are different in that the left column has a 1.5 sigma shift. LOOK at 4.5 and 6 and point to the Defect values. The column with the shift is normally used. It is used due to the fact that all process data i
您可能关注的文档
最近下载
- 静脉输液考试试题及答案.docx
- 2024-2025学年小学信息技术(信息科技)四年级上册湘科版(2024)教学设计合集.docx
- Tecsun德生PL368使用说明书.pdf
- 港口城市发展的动态研究——兼论上海国际航运中心建设-产业经济专业论文.docx VIP
- 第一单元起始课课件(34张PPT)2021-2022学年统编版高中语文必修上册.pptx
- 人教版七年级上册历史课件(全册).pptx VIP
- 桥本氏甲状腺炎课件.ppt VIP
- 完整word封条样式.doc VIP
- 老年人体重管理.pptx VIP
- 输变电工程数字化移交技术导则第1部分:变电站(换流站)[附编制说明],Q_GDW11812.1-2018.pdf VIP
文档评论(0)