- 1、本文档共16页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
705吹扫方案(国外英文资料)
705吹扫方案
First, the purpose and scope
The equipment and pipelines will bring various impurities in the installation process, such as welding slag, dust and so on, in the pilot car it is necessary to purge out, to prevent accidents of the valve action and equipment in operation; at the same time, the operation personnel familiar with the process.
The range of flushing includes 701 and the pipe in the inner pipe corridor (except the pipeline before entering the boundary zone).
Two, technical requirements
1, the steam pipe system by the same level of steam blowing, water system as much as possible by the system of pump for flushing, pipeline gas path system and the other cannot use the pump to wash, use low pressure nitrogen or compressed air purge.
2, the order of blowing washing should be in accordance with the general manager, the main branch, the branch pipe, the drain pipe, the instrument guide pipe, from near to far in turn, and each system branch should be blown separately.
3, the valve group: first purge valve manual valve and bypass valve group before disconnecting the purge (Flushing), then the valve replaced the short purge (Flushing), bypass and drain should purge (flushing).
4, single pump purge: front flange pump or pump body before the short break, then rinse import pipeline, installation of temporary filter in the import pipeline (or with the original pipeline with the filter), the return line on the orifice flange into the device before the demolition and broken open flushing pump return line.
5, when the purge medium to go through the equipment, and equipment connected upstream pipeline, must first sweep clean, in case debris into the downstream pipeline, equipment. If the blow - out port is placed before the stationary equipment, it is difficult to set aside the cleaning convenience. The blowing medium can enter the equipment and the equipment must be cleaned.
6, utilities pipeline with its transport fluid cleaning medium blowing (flushing).
7. The bl
您可能关注的文档
- !!!变压器的要求和技术参数(国外英文资料).doc
- (上卷)重新学会笑--------中国式新森田教...(国外英文资料).doc
- (宁鸣)晨间(国外英文资料).doc
- (四)津液-(国外英文资料).doc
- (新版)高强轻质高温耐火砖生产制造制备及应用工艺专利技术文集(国外英文资料).doc
- (图解)普林斯顿进攻体系(国外英文资料).doc
- (第1章) 单片机教案(国外英文资料).doc
- (考试时间:70分钟 试卷满分:70分 考试形式:开卷)(国外英文资料).doc
- - 上海LNG加气站 上海CNG加气站博客上海LNG加气站 上海CNG加气站博客(国外英文资料).doc
- ...我相信能耐耐心心看完文章的人,不用再对手机这东西纠结了_百度文库...(国外英文资料).doc
文档评论(0)