SC200施工升降机基础施工方案(国外英文资料)
SC200施工升降机基础施工方案
Overview of SC200 construction elevator construction scheme of the foundation engineering project overview 1. chapter 1.1, project name
1.2, project overview
This project is the name of the building residential area of A1-A7, D1-D7, A exergy shops, supermarkets, comprehensive cultural activity center,
The next room in the construction area of 35000 square meters; the construction area of 40016.01 square meters basement the basement on the 2 floor 23
The basement layer height is 6.2M the basement two layer 4.5M the total building height of the 79.3M.
1.3, the project site
The project is located in Panyu District Shilou town Chigang village.
1.4, design
The maximum height of the whole building is 23 79.00m. This design uses the installation of 2 sets of SC200/200TD construction elevator
Respectively for A5-A7 building structure construction. No. 01# to the 02# machine model SC200/200TD. One of the 6-1~6-5
6-G 6-14~6-17 design of shaft section, all of the 6-G axis in the center line are included for construction elevator. The whole construction went up
The erection and installation of the lowering machine eventually reached 50m height.
2.SC200/200TD construction lift conditions
SC type construction hoist the electrical and mechanical safety system of the main electric components are very reliable imported the original
The electric circuit is simple easy operation and maintenance of the low failure rate is the vertical transportation equipment safety, the construction of the university.
The construction of the lift drive mechanism with double motor drive and motor drive three to two types of the plug-in can be built at the
The user selects each motor is equipped with DC electromagnetic brake and the brake friction pair with automatic tracking and regulating braking gap
The function of improving the braking performance of the balanced and reliable.
2.1. model specification
S said the symbol C said rack type construction elevator
SC200/200 said the three
您可能关注的文档
- 346_228-发背对口治诀论(国外英文资料).doc
- 37wan英雄神殿攻略(国外英文资料).doc
- 2热化学(国外英文资料).doc
- 3dmax材质详细解析(国外英文资料).doc
- 3D参数(国外英文资料).doc
- 3水 准 测 量(国外英文资料).doc
- 3血液 生理(国外英文资料).doc
- 4.25联考申论高分宝典(国外英文资料).doc
- 4.2补丁新增(全)(国外英文资料).doc
- 4003tqxh201(国外英文资料).doc
- 2025中国电信股份有限公司涡阳分公司外包人员招聘1人笔试题库附答案.docx
- 2025中国农业科学院农业信息研究所第二批招聘5人笔试备考题库附答案.docx
- 2025中国地质科学院招聘科研助理2人笔试题库附答案.docx
- 2025安徽中共宿州市纪委、中共宿州市委巡察办所属事业单位选调工作人员8人备考题库附答案.docx
- 2025年11月广东深圳市大鹏新区科技和工业信息化局招聘编外人员1人笔试参考题库附答案.docx
- 2025国务院国资委委属事业单位招聘5人笔试题库附答案.docx
- 2025南方电网玉溪供电局项目制用工招聘备考题库(38人)附答案.docx
- 2025中新天津生态城教育系统招聘教职人员参考题库(297人)附答案.docx
- 2025中国移动校园招聘即将启动笔试参考题库附答案.docx
- 2025北京市化工职业病防治院退役大学生士兵定向招聘笔试参考题库附答案.docx
原创力文档


文档评论(0)