小水电保险方案概要1
小水电工程项目
安装工程一切险
保险经纪有限公司
年 月 日
CONTRACTOR’S ALL RISKS
Policy Form: Based on Standard Munich Re Policy and Following endorsements Original Insured
Section I II
Employer/Owner:
(b)EPC Contractor:(c)The sub-contractors and sub-suppliers of any tier()
()Project Financiers
)any Operator, Licensor/Licensee, Franchisor/Franchisee and/or Manager with whom Employer/Owner has entered or will be entering into agreements(s) or contract(s) in connection with the Project;
All for their respective rights and interest. Insured Project Sisira hydropower plant
Project Location Period of Insurance Construction/Erection Period: Within about 650 days from the date to be advised including testing and commissioning of 2 months.
Any extensions of the Period of Insurance are automatically held covered up to 6 months without additional premium; any further extension should be charged by an additional premium of no greater than pro-rata premium.
Plus 12 months extended Maintenance / Defects Liability period. Maintenance or Defects Liability Period commence from the date of the Completion of the Project.
Completion of the Project means the handover of all property (after acceptance by the Employer according related conditions in the related contract unless otherwise determined by the Employer) of the Project from Contractors to Employers.
Interest Insured
Section I – Material Damage
Construction/Erection works: All permanent and temporary works, temporary buildings, materials, spares, machinery and equipment, office equipment, tools, and all other property or equipment of whatsoever nature or description, the property of the Insured or that for which they are responsible at the site or elsewhere within the Territorial Limits including whilst in transit or temporarily stored at or away from the site all in connection with the project work.
Contractor’s Plant and Equipment
Section II – Third Party Liability
To cover legal liability arising out of the performance of the pro
您可能关注的文档
最近下载
- 跨国公司在华本土化策略分析——以肯德基为例.doc
- 乳腺癌患者输液港留置期间自我护理能力及影响因素研究.doc
- 2024~2025学年八年级数学上册专题1.13 三角形全等几何模型(半角模型)(知识梳理与考点分类讲解)-2024-2025学年八年级数学上册基础知识专项突破讲与练(苏科版)「含答案」.pdf
- 中国荨麻疹诊疗指南2023版.docx
- 《型号: UC-CK》.pdf
- 2024年山东省聊城市中考生物试题卷(含答案逐题解析).docx
- 电子电路与系统基础II(李国林)2011秋季学期期中考题.pdf VIP
- 《电子电路与系统基础II》 2012秋季学期期中考题_48909911.pdf VIP
- 清华大学《电子电路与系统II》期末考题.pdf VIP
- 一年级数学整理房间教学设计.doc VIP
文档评论(0)