小水电保险方案概要1.doc

  1. 1、本文档共16页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
小水电保险方案概要1

小水电工程项目 安装工程一切险 保险经纪有限公司 年 月 日 CONTRACTOR’S ALL RISKS Policy Form: Based on Standard Munich Re Policy and Following endorsements Original Insured Section I II Employer/Owner: (b)EPC Contractor:(c)The sub-contractors and sub-suppliers of any tier() ()Project Financiers )any Operator, Licensor/Licensee, Franchisor/Franchisee and/or Manager with whom Employer/Owner has entered or will be entering into agreements(s) or contract(s) in connection with the Project; All for their respective rights and interest. Insured Project Sisira hydropower plant Project Location Period of Insurance Construction/Erection Period: Within about 650 days from the date to be advised including testing and commissioning of 2 months. Any extensions of the Period of Insurance are automatically held covered up to 6 months without additional premium; any further extension should be charged by an additional premium of no greater than pro-rata premium. Plus 12 months extended Maintenance / Defects Liability period. Maintenance or Defects Liability Period commence from the date of the Completion of the Project. Completion of the Project means the handover of all property (after acceptance by the Employer according related conditions in the related contract unless otherwise determined by the Employer) of the Project from Contractors to Employers. Interest Insured Section I – Material Damage Construction/Erection works: All permanent and temporary works, temporary buildings, materials, spares, machinery and equipment, office equipment, tools, and all other property or equipment of whatsoever nature or description, the property of the Insured or that for which they are responsible at the site or elsewhere within the Territorial Limits including whilst in transit or temporarily stored at or away from the site all in connection with the project work. Contractor’s Plant and Equipment Section II – Third Party Liability To cover legal liability arising out of the performance of the pro

文档评论(0)

676200 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档