- 1、本文档共47页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
肯尼迪航天中心-航天飞机的家
KSC Operations Shuttle Ceiling Constraints Shuttle Precipitation Rule Shuttle Temperature Rules Shuttle Pad Wind Constraints Terminology Acronyms In an effort to answer the questions that come from Shuttle Processing Managers with each hurricane bulletin, the Shuttle Launch Weather Officer and Shuttle Managers worked together to create this product that provides shuttle managers information on the current location, forecast, timing, and risk to KSC of any storm that threatens us. Shuttle managers use this as a decision tool to make decisions on when to act when a hurricane approaches. If necessary, a rollback will be directed by the Launch Director to protect the vehicle from a hurricane. A rollback may also occur If there are any problems with the vehicle during launch preparation. As we approach the launch date, many pre-launch operations occur. This includes an APU hotfire which requires RSS retract, a Terminal Countdown Demonstration Test, a barge move, SRB recovery operations, and RSS retract in preparation for launch. Also, the Shuttle Launch weather officer must produce many forecasts and provide several briefings. Let’s discuss some of these now. Two to three weeks before launch, the astronauts arrive for their They spend three days at KSC training, the last day of which is a practice countdown. During the countdown, they perform all the actions they will on launch day, but without actual tanking or RSS retract. The Shuttle Launch Weather Officer is on console and in communication with the Launch Director, providing updates to weather constraints as if it were a countdown. When the crew ingresses to the shuttle, there can be no lightning within 5NM of the VAB and Pad. After the countdown is complete, the crew remains at the launch pad for egress training, so lightning is still a concern until they complete their training. During the week before launch, the External Tank Barge must be moved across the small bay by the press site to clear the pres
您可能关注的文档
- 考研英语阅读理解标准90篇+提高30篇unit-10.doc
- 考研英语阅读理解标准90篇+提高30篇unit-12.doc
- 考研英语阅读理解标准90篇+提高30篇unit-11.doc
- 考研语法定语从句.doc
- 考研英语阅读理解标准90篇+提高30篇unit-2.doc
- 考研讲座2013-5-11(修订中).ppt
- 考研英语阅读理解标准90篇+提高30篇unit-8.doc
- 考研阅读理解100篇(附答案).docx
- 考试复习资料C12.ppt
- 考验英语万能句式.doc
- 《GB/Z 44363-2024致热性 医疗器械热原试验的原理和方法》.pdf
- GB/T 16716.6-2024包装与环境 第6部分:有机循环.pdf
- 中国国家标准 GB/T 44376.1-2024微细气泡技术 水处理应用 第1 部分:亚甲基蓝脱色法评价臭氧微细气泡水发生系统.pdf
- 《GB/T 44376.1-2024微细气泡技术 水处理应用 第1 部分:亚甲基蓝脱色法评价臭氧微细气泡水发生系统》.pdf
- GB/T 44376.1-2024微细气泡技术 水处理应用 第1 部分:亚甲基蓝脱色法评价臭氧微细气泡水发生系统.pdf
- 中国国家标准 GB/T 44315-2024科技馆展品设计通用要求.pdf
- GB/T 44305.2-2024塑料 增塑聚氯乙烯(PVC-P)模塑和挤塑材料 第2部分:试样制备和性能测定.pdf
- 《GB/T 44315-2024科技馆展品设计通用要求》.pdf
- GB/T 44315-2024科技馆展品设计通用要求.pdf
- GB/T 39560.9-2024电子电气产品中某些物质的测定 第9 部分:气相色谱-质谱法(GC-MS)测定聚合物中的六溴环十二烷.pdf
文档评论(0)