pdf-20万吨级卸荷式板桩码头数值分析.pdfVIP

  • 0
  • 0
  • 约1.94万字
  • 约 7页
  • 2017-09-02 发布于天津
  • 举报

pdf-20万吨级卸荷式板桩码头数值分析.pdf

pdf-20万吨级卸荷式板桩码头数值分析

DOI 10.11779/CJGE201502002 20 # 36 20 ABAQUS 20 TU43 A 2015 1965 E-mail: zycai@nhri.cn 库 Numerical analysis of 200000-tonnage sheet-pile wharf with relieving platform 1 1, 2 2 1 例 CAI Zheng-yin , HOU Wei , ZHOU Jian , XU Guang-ming (1. Department of Geotechnical Engineering, Nanjing Hydraulic Research Institute, Nanjing 210024, China; 2. Department of Geotechnical Engineering, Tongji University, Shanghai 200092, China) 案 Abstract: No. 36 Berth of Jingtang Port, a 200000-tonnage general bulk cargo berth, adopts the structure of sheet-pile wharf E with relieving platform. It is currently the largest sheet-pile wharf in the world. For the deep-water sheet-pile structure with A relieving platform, the existing design codes and specifications are not practical, leading to difficulties in structural design and C optimization to a certain extent. The design schemes for the 200000-tonnage sheet-pile wharf are numerically simulated by means of the compiled program for the soil-structure inter

文档评论(0)

1亿VIP精品文档

相关文档