- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
* * * * * According to GWDC practice in the field, one of the solutions is well factory operation. Yes, that is well factory drilling, fracturing, production, etc. As my presentation in the beginning, the success of UCR depends on the … * Up to now, we had carried out the well factory operation in different area, different size of the pad. Such as 6-well-pad, 9-well-pad, 13 well-pad. Now I will go deep for each pad. First, 6-well-pad for shale gas project at Wei 204 202. We provide the 8 rigs at 4 pads. The fracture operation will start in the coming January. Expected productivity is 14 billion cubic feet shale gas per year after 64 wells drilled. * For 6-well-pad, the 6 wells wellhead divided into 2 rows, each row 3 wells. Consideration on the cost, the water based mud is used in the vertical section (phase 1 and phase 2), the OBM is used in the horizontal section (phase 3). Therefore, all the wells in phase 1 and phase 2 to be drilled together, after that, displace the WBM with OBM, continue all the well phase 3 drilling. Let me show you the batch drilling in this chart. * The Advantages of this well factory operation mode is: Skid-mounted rig, moving the rig without laying down DP and DC, to save the rig move time; Dual rig operation at the same time, to reduce the whole pad construction time; Batch drilling, easy to take lessons learned for each phase drilling, drilling performance improved well by well; Avoiding the replacement of WBM and OBM in each well; easy to deal with OBM and it’s waste handling, meanwhile, reducing the OBM consumption; Cost saving and time saving. * * The third, integrated technology requires the sound project management, to take the precaution actions to meet the clients schedule, quality and cost. This chart is to show that we monitor the each rig performance daily for shale gas project, take lessons learned, and share the good practice among the different rig crew. * Secondly 9 well pad, the 9 well located in one row. For tight
文档评论(0)