- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
五金模小知识(Small hardware knowledge)
五金模小知识(Small hardware knowledge)
Stamping process
The stage of the die die, the mode, the die, the die, the die, the die, the die, the die, the die. The upper and lower countertops should be cleaned, no foreign bodies should be allowed. No debris should be found in the base of the mould. The mould should be placed in the center of the punching table. The stroke of the bed chooses to move. When pressing the mould, the sliding block should be lifted first, then the moving mode will slowly descend to the dead center. With the mold of the handle, the handle must be pointed at the handle hole to the bottom of the die. The mold of the die without the handle, place the mold in the proper position, and pay attention to the mold of the blanking hole must not block the blanking hole. The pad must be flat and checked for balance, and be careful not to block the material and damage the mould. The moulded die is pressed to the top of the mould, then it is put into the waste material needed to make the blanking material. Use the slider to adjust to the appropriate height of the closure, and make two or three times, and then lock the mold. 3 b ~ m8au * W! When the mould rack of U 6 V is closed, the sliding block will be raised to the thickness of the material. After frame: check whether the upper and lower dies are locked and check whether there are abnormal phenomena in the upper and lower modes. The tools are in place to clean the scene. The attention matters of the model: first select the punch press suitable for the mould, and the sliding block should be lifted first when the mould is pressed, and the mode of debugging must be in inches, and the mould of the punching machine can be avoided because of the excessive speed. The personnel should stay away from the danger zone when the forklift truck goes to the punching machine. The top and bottom template should be cleaned and no foreign body. The die must exit the die holder screw, and the die handle and the size of the die han
您可能关注的文档
- 《高等数学》教学大纲 - 广西大学324(Advanced mathematics teaching syllabus - guangxi university 324).doc
- 《高等数学二》教学大纲(Advanced mathematics 2 teaching outline).doc
- 《高等数学课程》(下)教学大纲(本科用)(Higher mathematics course (lower) syllabus (undergraduate)).doc
- 《魔法黎明》破译天书--教你如何拼写符文(rune word )(Magic dawn deciphering the sky -- teaching you how to spell rune word).doc
- 《黑色洛城》中文问答全攻略(Black luocheng Chinese q&a).doc
- 『内蒙古』让你倍感亲切的巴盟话文章(Inner Mongolia makes you feel like the kind of bag-talk article).doc
- 【2012考研必备资料】考研数学一大纲(The outline of the mathematics of the postgraduate entrance examination).doc
- 【EMULE】电驴各文件用途说明([EMULE] for the purpose of each document).doc
- 【千滚水】饮水机反复烧水有多大害(How harmful is the repeated water drinking machine).doc
- 【买菜也有范儿】([there are also models for buying food]).doc
文档评论(0)