网站大量收购独家精品文档,联系QQ:2885784924

吊顶施工(Condole carries on the construction).doc

  1. 1、本文档共18页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
吊顶施工(Condole carries on the construction)

吊顶施工(Condole carries on the construction) Top lift 6.1 general provisions 6.1.1 this chapter applies to the quality acceptance of the divisional works such as the ceiling of the dark keel and the suspension of the Ming longbones. Description: 6.1.1 this chapter is applicable to the ceiling project of the keel and decoration panel. According to the construction technology, it is also divided into the ceiling of the keel and the ceiling of the Ming long bone. 6.1.2 the following documents and records shall be checked for the acceptance of the ceiling project: 1. Construction drawings, design instructions and other design documents of the ceiling project. 2. Product qualification certificate, performance test report, entry and acceptance record and reinspection report. 3. Concealed work acceptance record. Construction record. 6.1.3 the ceiling project shall be reinspected by the formaldehyde content of the man-made board. 6.1.4 suspension engineering shall be subject to acceptance of the following concealed works projects: 1. Installation of pipe and equipment in ceiling, installation of equipment and water pipe test. 2. Wooden keel fire protection and anti-corrosion treatment. Embedded parts or tendons. 4 boom installation. 5 keel installation. 6 fill the material Settings. Description: 6.1.4 in order to not only ensure the use safety of condole top project, and achieve the completion inspection and acceptance does not destroy finishes, ceiling engineering concealed engineering acceptance is very important, set forth in this article listed shall provide for the concealed engineering acceptance certificate signed by supervision engineer. 6.1.5 the inspection approval of each sub-item shall be divided according to the following provisions: The same variety of ceiling works shall be divided into one inspection batch per 50 (large area rooms and corridors with a ceiling area of 30m2), and less than 50 shall be divided into one inspection batch. 6.1.6 inspection quantity

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档