网站大量收购独家精品文档,联系QQ:2885784924

哈尔滨桥塌(Harbin bridge collapse).doc

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
哈尔滨桥塌(Harbin bridge collapse)

哈尔滨桥塌(Harbin bridge collapse) Uninsurable bridge design brings danger to the bridge There is a high probability that the accident will be connected According to the central peoples broadcasting station reported, Harbin industrial university space steel structure curtain wall co., LTD., President, Dr. Chen Yueming engaged in steel structure design and construction for many years, after carefully watch the scene of the accident, there is a reason for the accident may be joint rivet head was not enough. In the investigation of the accident, the traffic control department of Harbin city security, transportation and public security has ordered the overturned vehicles to be ranked from north to south, respectively, from 1 to 4. According to the survey, no. 1 truck will weigh 22 tons, and the total weight of the trucks from 2 to 4 will be more than 400 tons, and the volume of the two and four cars will be changed to non-standard vehicles. Bridge while overload operation of cars, more than four hundred tons of weight car sounds amazing, but for the whole bridge of self-respect, under normal circumstances even considering the effect of shear stress, the load on the trigger an entire block of the bridge side should be negligible. The collapse of the bridge, which is close to the bridge of the accident, indicates that the total connection project of the bridge is not completed, which should be a whole bridge and is divided into several paragraphs. The collapse of the bridge is independent and the adjacent bridge cannot share the torque stress, so the accident happens. [details] Harbin group bridge accident scene. The combination of the seismic support of the bridge and the single-column design, the security risks have been greatly increased According to Dr Chen, the sliding deck is like a bench with only two legs, and the supporting point is on the middle of the bench. The design of bridge connections and support is likely to be flawed, but it is not enough to cause it to fal

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档