- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
大体积混凝土浇筑方案(Large - volume concrete pouring scheme)
大体积混凝土浇筑方案(Large - volume concrete pouring scheme)
Large volume concrete construction scheme
I. project overview:
This project is A modern architecture integrating commercial and office apartments, with A floor covering four floors of the ground floor, and A full 24-floor, twenty-nine floor, with A total construction area of 74,500 square meters. The structure type is framer shear wall structure. The basement of this project is a parking lot. There are fire and water pump room, power supply room and generator room, one to four floors are mainly commercial and office rooms, and the five floors are elevator apartments. This work and basic part of post-cast strip according to the basement is divided into six job partitions, 1, 3 area to 1600 thick raft foundation, the remaining water resistant plate for 400 thick foundation, design of pile caps bottom elevation 5.2 meters, USES the C40 concrete seepage control, permeability grade is 0.8 Mpa, the amount of concrete foundation slab is about 4000 cubic meters. In addition to 2, 5 and 6 districts, the other has been completed. This scheme is applicable to the construction of foundation concrete in 2 districts, 5 districts and 6 districts.
Ii. Construction preparation:
The construction technology of large volume concrete is relatively high, especially in the construction, to prevent the temperature difference caused by the cement hydration heat to produce the temperature stress crack. Therefore, it is necessary to make adequate preparations for the material selection, technical measures and other relevant links to ensure the smooth construction of the base floor mass concrete.
1. Material selection
The project is made of concrete. The main material requirements are as follows:
(1) cement: considering the ordinary cement hydration heat is higher, especially the application in mass concrete, a large number of cement hydration heat is not easy to send out, in the concrete internal temperature is too high, large temperature di
您可能关注的文档
- 古风歌歌词(Song lyrics).doc
- 可以报考一级建造师的所有专业(Can enter oneself for an examination of all the professional of class a builder).doc
- 可变正时(Variable timing).doc
- 可靠性验证试验(Reliability verification test).doc
- 可变气门(Variable valve).doc
- 台球入门基本要领(The basic essentials of billiards).doc
- 台风ジェネレーション.(台风热电).doc
- 台风命名法(Typhoon nomenclature).doc
- 台式机电脑主板检测代码全(Desktop computer motherboard detects code all).doc
- 台球杆养护(Club curing).doc
- 大道物流(Road logistics).doc
- 大重量硬拉(Heavy hard pull).doc
- 大陆一线城市(First-tier cities).doc
- 大雾消散时间的客观化预报(Objective prediction of fog dissipation time).doc
- 大黄、地黄、黄连、黄柏、黄芪、黄芩(Rhubarb, dihuang, huang lian, huang bai, huangqi, huangqin).doc
- 天天都是环境日(演讲稿)(Environment day every day).doc
- 天山之夏教案(The tianshan summer teaching case).doc
- 天气原因用语(Weather terms).doc
- 天津09年自考计算机外围设备使用与维护考试大纲(Tianjin 2009 self-examination computer peripheral equipment use and maintenance examination outline).doc
- 天正建筑命令(Building orders).doc
文档评论(0)