- 1、本文档共26页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
安全员C证考试试题(Safety officer C test question)
安全员C证考试试题(Safety officer C test question)
Jiangsu construction safety officer C certificate test
Single topic selection:
1. If the wetland area is excavated, it can be excavated for artificial precipitation when it is lowered to the bottom of the pit (0.5 to 1.0 meters).
When digging in the expansive soil area, do a good job (drainage) before excavation.
3. When the reinforced concrete filling pile is used, the excavation standard is the pile body concrete (after the design strength).
4. When the earthwork is excavated manually, the operation spacing of the two should be kept (1 m).
5. The shield structure should test the concentration of combustible gas every day, to predict the prevention and control work, and to do well (to record the account).
6. The drainage ditch and the collecting well should be set in (beyond the base range).
7. The rectifying jack in the tool tube should be insulated well, and the operation of electric high pressure oil pump should be (wear insulating gloves).
8. The excavated vehicles should be guided, strictly prohibited.
9. The top of the top tube shall exceed (50 m) to prevent hypoxia and suffocation.
10. Construction of the top tube. The oxygen and the acetylene cylinder (must not enter the pit).
11. The lighting telecommunication system in the pipeline is generally used (low voltage).
The supporting installation must be carried out in the order of the (slotting support).
13. The removal of support shall be constructed in the order of (after being replaced).
The base point should not be less than (2).
The template and its stents must be set in the installation process (the temporary fixtures that can effectively prevent capsizing).
16. The minimum height of the operating platform for the template installation must be (2.0 m).
17. Set horizontal scissor support when the bracket is higher than (4.0 meters).
18. During the operation of the suspended part, the operator should (fasten the seat belt).
The minimum distance of a template in th
您可能关注的文档
- 唐蕃古道骑行攻略(The tangfan road cycling strategy).doc
- 唐菖蒲[剑兰]切花标准(The standard of cut flowers of tang calamus).doc
- 唐诗三百首及作者(Three hundred tang poems and the author).doc
- 售后抱怨应对话术 .txt(After-sales complaints should be talked about. TXT).doc
- 唯美伤感古诗词(Beautiful sentimental ancient poetry).doc
- 唯美诗句(Only beautiful verse).doc
- 商业地产产品发展概述与浅析(Overview and analysis of the development of commercial real estate products).doc
- 商业模式创新的 4个维度(Four dimensions of business model innovation).doc
- 商业空间中的导视系统设计探析(Design and analysis of guided systems in commercial space).doc
- 商品房买卖司法解释第十三条解读(The interpretation of article 13 of the judicial interpretation of commercial housing transactions).doc
- 安全员考试案例分析(Safety officer test case analysis).doc
- 安全工况的事故分析应对(Accident analysis of safe working conditions).doc
- 安全导向(Security guide).doc
- 安全文明施工组织设计(Design of safe civilization construction organization).doc
- 安全手抄(Security, hand-written).doc
- 安全常识试题(Question of safety).doc
- 安全施工规范(Safety code).doc
- 安全模式的几点用途(Several USES for safe mode).doc
- 安全生产文明施工管理规定(Regulations on the construction management of safe production).doc
- 安全生产网络实名制实施方案(Implementation plan of real-name system of safe production network).doc
文档评论(0)