网站大量收购独家精品文档,联系QQ:2885784924

安全生产网络实名制实施方案(Implementation plan of real-name system of safe production network).doc

安全生产网络实名制实施方案(Implementation plan of real-name system of safe production network).doc

  1. 1、本文档共21页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
安全生产网络实名制实施方案(Implementation plan of real-name system of safe production network)

安全生产网络实名制实施方案(Implementation plan of real-name system of safe production network) Liangshan county lunda plaza commercial project Establishment person: CAI to group li Juan Censor: feng jun Liang shan county project construction supervision center Project supervision department of lunda plaza April 25, 2014 Detailed rules for construction energy conservation project supervision 1. Supervision work basis 1.1 engineering design drawings and design changes of lunda plaza, liangshan county; 1.2 construction quality acceptance criterion for building energy conservation project (gb50411-2007). 2. Control measures for building energy conservation projects 2.1 review the corresponding qualifications required by the construction units, and the on-site construction quality management shall have corresponding technical standards, sound quality management system and strict inspection system. 2.2 construction units shall not modify the design documents without authorization, find problems, and deal with the design change procedures in a timely manner. The construction unit shall prepare the construction plan and conduct the foundation and training. (gb50411-2007) requirements: design changes should be reviewed by the original construction drawing review body; The supervision engineer shall review the project changes proposed by the construction unit or the construction unit and find that there are any violations of the building energy efficiency standards, and the written comments shall be put in place to stop them. 2.3 the insulation measures should be taken to remove the attachment, such as the balcony, rain cover, air conditioner selection board, external wall column, window, decorative line, and external wall balcony, etc. 2.4 supervision engineer shall verify the construction unit for engineering related to building energy conservation function and environmental protection an important part of the material of product certification, product manuals, product identification, t

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档