- 1、本文档共21页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
安全生产网络实名制实施方案(Implementation plan of real-name system of safe production network)
安全生产网络实名制实施方案(Implementation plan of real-name system of safe production network)
Liangshan county lunda plaza commercial project
Establishment person: CAI to group li Juan
Censor: feng jun
Liang shan county project construction supervision center
Project supervision department of lunda plaza
April 25, 2014
Detailed rules for construction energy conservation project supervision
1. Supervision work basis
1.1 engineering design drawings and design changes of lunda plaza, liangshan county;
1.2 construction quality acceptance criterion for building energy conservation project (gb50411-2007).
2. Control measures for building energy conservation projects
2.1 review the corresponding qualifications required by the construction units, and the on-site construction quality management shall have corresponding technical standards, sound quality management system and strict inspection system.
2.2 construction units shall not modify the design documents without authorization, find problems, and deal with the design change procedures in a timely manner. The construction unit shall prepare the construction plan and conduct the foundation and training. (gb50411-2007) requirements: design changes should be reviewed by the original construction drawing review body; The supervision engineer shall review the project changes proposed by the construction unit or the construction unit and find that there are any violations of the building energy efficiency standards, and the written comments shall be put in place to stop them.
2.3 the insulation measures should be taken to remove the attachment, such as the balcony, rain cover, air conditioner selection board, external wall column, window, decorative line, and external wall balcony, etc.
2.4 supervision engineer shall verify the construction unit for engineering related to building energy conservation function and environmental protection an important part of the material of product certification, product manuals, product identification, t
您可能关注的文档
- 商品分类查询(Commodity classification enquiry).doc
- 商场空调(Mall air conditioning).doc
- 唯美、悲情的优美句子和古文诗句2(Beautiful, sad and beautiful sentences and verse 2).doc
- 商场吊顶施工流程(Shop ceiling construction process).doc
- 商场设计资料(Store design information).doc
- 商店建筑中营业厅安全疏散宽度计算方法(The calculation method of safe evacuation width for shop buildings).doc
- 商铺橱窗设计中须注意的几个问题(There are several problems in shop window design).doc
- 啤酒检验(Beer inspection).doc
- 啤酒糟养出 啤酒鸭(The beer made the duck out of the water).doc
- 喜欢做菜的进来学学(I like to come in and learn to cook).doc
文档评论(0)