网站大量收购独家精品文档,联系QQ:2885784924

安全生产文明施工管理规定(Regulations on the construction management of safe production).doc

安全生产文明施工管理规定(Regulations on the construction management of safe production).doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
安全生产文明施工管理规定(Regulations on the construction management of safe production)

安全生产文明施工管理规定(Regulations on the construction management of safe production) Regulations on the construction management of safe production 1. Construction site gate and enclosure The gate and post of the construction site should be strong, beautiful and not below 2M. The posts along the main street of the city should be rectangular or square, with short sides not less than 0.36 M. The wall of the construction site should be closed, complete, firm and beautiful. The upper part should be flat, the facade should be straight, and the height is not less than 1.8 meters. Along the wall of the street, the soft materials such as sheet metal, standard block material, organic plank, asbestos sheet, woven cloth, and fabric are used to tighten the tension. 3, the construction site should be near the gate setting clear 0.7 meters wide, 0.5 meters high construction signs, set forth the name of the project, building area, construction units, design units, construction units, construction site, head of content such as name, start date, completion date. The font is neat, bright and beautiful, setting height base is not less than 1.2 meters. There should be 4, inside the door construction layout, scale suitable, the content is complete, the general is given priority to with structure during the construction plan, also can be divided into basic period stage, structure, decoration plan were set up. There should also be safety production management system board, fire protection management system board, field capacity health and environmental protection system board, content is concise, practical, the handwriting work integral specification. Temporary facilities 1, the use of the construction site or near the existing facilities (including the demolition but can temporarily use buildings), projects under construction itself to complete the structure of the building engineering (for the use of temporary construction, commissioning before decorate). 2. Temporary facilities that must be bui

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档