- 1、本文档共23页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
市政实务复习题(Practice of municipal practice)
市政实务复习题(Practice of municipal practice)
[municipal practice] full 2013
1. A subgrade + C
2. Under normal temperature, + C 7
3. In the non-groundwater + D clay soil
4. Cement concrete + B fall
The process of static + D sinking
6. Regarding plate girder + B adoption
7. Project department + D10
About + C reverse pocking
9 drains + D 1-3-5-4-6-2-8-7
10. Flexible drainage pipe + D medium coarse sand
11. About the first and the first
12. The following support + A is now watered
13. Shallow buried excavation + D method
In 2013, the second class construction division municipal public works management and practical problems and analysis
1. Single choice questions (total 20, 1 point for each question, only 1 of the candidates for each question are most consistent with the question)
1. The effect of a certain subgrade pressure on working hours is to generate spring phenomenon, and the appropriate treatment is ().
A. increase the power of compaction
B. Moderate sprinkling of water
C. The mixing of lime and lime is compacted
D. Lower roller compaction speed
[answer] C
The method of foundation reinforcement is examined in this paper. The spring phenomenon of the roadbed is mainly the material water content is too large, which needs to be reinforced with cement, lime or mortar, so as to improve the bearing capacity of the foundation. See textbook P9.
2. At normal temperature, the curing time of cement stabilized soil should be at least () days.
5 A.
6 B.
7 C.
8 D.
[answer] C
The technical requirements of different grassroots construction are examined. The cement stable soil base must be hydrated and maintained, preventing and drying up and wet. After living at normal temperature, it should be maintained by 7d before it can be built on top of it. See textbook P12.
3. Excavate 4.5 m deep foundation pit in the non-groundwater homogeneous soil layer. If there is no load at the top of the pit, the soil type of the foundation pit wall should not be greater than 1:1 ().
A. sand soil
B. g
您可能关注的文档
- 夏季池塘水质培养措施 _水质调节技术_Xinnong_com(Summer pond water quality training measures _ water quality regulation technology _Xinnong_com).doc
- 外建归纳(Outside the building of induction).doc
- 外科复习题(Surgical review).doc
- 外科习题二(Surgical problem 2).doc
- 外文文献翻译(Foreign literature translation).doc
- 多媒体课室常见故障分析(Common failure analysis of multimedia classroom).doc
- 多层砖房裂缝的根源(The root of the cracks in multi-storey brick houses).doc
- 多轴后处理的写法(Multi-axis postprocessing).doc
- 夜场游戏机,夜场游戏机商业用途(The night game game machine, the night game game game business use).doc
- 大二逻辑学复习资料(Sophomore logic review materials).doc
文档评论(0)