市政排水管道安全文明生产环保措施(Environmental protection measures for the safety of municipal drainage pipelines).docVIP

市政排水管道安全文明生产环保措施(Environmental protection measures for the safety of municipal drainage pipelines).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
市政排水管道安全文明生产环保措施(Environmental protection measures for the safety of municipal drainage pipelines)

市政排水管道安全文明生产环保措施(Environmental protection measures for the safety of municipal drainage pipelines) 1. Control engineering quality related measures 1. Quality control of construction materials Many municipal drainage pipeline problem more on the quality of the pipe, some of the natural fracture and permeability pipe compressive ability is weak, appear easily makes the project after the completion of the phenomenon of water penetration. In order to guarantee the engineering quality, construction should choose normal manufacturer production tubing, before entering the construction site of pipe must be sampling inspection, strict inspection of tubing inspection of mechanical test report and factory certificate etc, check the pipe appearance, found peeling, damaged, honeycomb, crack, the phenomenon such as explicit shall be put into use, guarantee the quality of tubing. 2. Quality control during excavation of groove Production safety and engineering quality must be taken into account comprehensively determine the excavation section, at the bottom of the channel, the bottom of the channel width, dig deep, factors such as slope gradient as the main basis, determine the slotted section, to ensure reasonable science of slot section; Balancing the rational science and economy of slope and slope, ensure smooth and construction safety; If the impact of the construction site cannot meet the safety construction requirements, it needs to support the pit groove. Dig surface in the process of excavation, want to use broken slag layer of asphalt layer and roadbed, digging out after a certain distance, must strict measurement of the groove bottom elevation control, pay special attention to not super excavated base above, if overexcavation backfill compaction carefully, avoid by all means is filled with silt, garbage soil, humus soil does not conform to the standard, such as soil, put an end to the bottom of the channel of the lower note in the feed water. 3. Control of construction q

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档