- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
戴德梁行房屋接管验收标准(DTZ building will take over acceptance criteria)
戴德梁行房屋接管验收标准(DTZ building will take over acceptance criteria)
This article is contributed by silence_boy123
Doc documents may have a poor browsing experience at the WAP end. It is recommended that you choose TXT, or download the source file to the native view.
DTZ real estate consultant (guangzhou) co. LTD
Operating procedures
Housing takeover acceptance criteria
DTZ/GZ/PM/DTZ/GZ/PM /
Edition: the first revision: shape: version
approval
The date of
audit
The date of
To compile
The date of
years
month
Promulgated by the
years
month
Day of implementation
Orders,
record
1. Housing takeover acceptance criteria
2. Building takeover and acceptance schedule
3. List of information of the building takeover documents
4. Unit acceptance delivery form
5. Inspection and acceptance of missing engineering records
Standard for acceptance of house acceptance
Document no. : DTZ/GZ/PM/version: first edition
Housing takeover acceptance criteria
1. Objective to ensure the quality of the house and to safeguard the interests of the merchants. The applicable scope applies to new houses and the takeover of original houses. Acceptance standard 3.1 new homes to take over the acceptance standard 3.1.1 new homes to take over the acceptance, is on the basis of the completion acceptance, the main structure safety and meet the use function as the main content of the test again. The construction of the conditions under which the acceptance and acceptance shall be completed shall be completed, and the acceptance of the construction shall be completed. Power supply, water supply and drainage, sanitation, roads and other equipment and facilities can be used normally; The house number is confirmed by the relevant department. The receiving party shall retrieve the document of approval of the submitted property right information project; Land approval documents; Building licenses; Relocation information. Takeover acceptance shall retrieve the submitted technical data
2.
3.
3.1.3
3.1.4
Page 1, 11 pages
S
您可能关注的文档
- 工厂安全生产管理总则(Factory safe production management general).doc
- 工地名称(The site name).doc
- 工厂员工日常行为规范_百度知道(Daily behavior standard of factory staff - baidu knows).doc
- 工商管理论文405题(Business administration paper 405).doc
- 工地注意和规范(Site attention and specification).doc
- 工作总结防治非典工作总结(Summary of work summary and control of SARS).doc
- 工程信息(Engineering information).doc
- 工控机与普通有电脑有什么区别(What is the difference between an industrial control machine and an ordinary computer).doc
- 工程地质与水文地质名词解释(Engineering geology and hydrogeological terms).doc
- 工程地质形成性考核册(Engineering geological formation assessment volume).doc
- 房产测量知识问答(Real estate measurement knowledge q&a).doc
- 房地产企业岗位招聘笔试题题库之三十六(含答案)景观设计师(Real estate enterprise post recruitment pen test question number 36 (including answer) landscape architect).doc
- 房屋构造(Building construction).doc
- 房屋建筑工程基础二(Building engineering foundation ii).doc
- 房屋建筑构题(Building architecture).doc
- 房源发帖模板(Room source Posting template).doc
- 所有大题(All the big questions).doc
- 所有权学习笔记(Ownership learning notes).doc
- 手办基础知识(Basic knowledge of hand).doc
- 手动式综合验光仪的操作程序(Operation procedure of manual comprehensive optometry).doc
文档评论(0)