构建和谐工地 推动项目管理(Build a harmonious site to promote project management).docVIP

构建和谐工地 推动项目管理(Build a harmonious site to promote project management).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
构建和谐工地 推动项目管理(Build a harmonious site to promote project management)

构建和谐工地 推动项目管理(Build a harmonious site to promote project management) As the main body of social economic cells and market economy, enterprises cannot survive and develop without the construction of harmonious society, and construction of harmonious society cannot be achieved without the harmonious construction of enterprises. Construction enterprise is the project site as the basic unit, construction of harmonious construction enterprises must start from the construction of a harmonious construction site, the construction of harmonious construction site, can constitute the harmony of the entire construction enterprise. Build a harmonious site to promote project management -- - phase 1 project of source river water plant Zhang lei tang xiongxing zhu jie Chen shao-jun Source water factory first phase 2 standard by Shanghai tunnel engineering co., LTD. Construction, the construction scope mainly includes: flocculating settling basin, sand filter, rinse lifting pump house, touch the sand filter - clear water reserviors, water Wells, the secondary pump room, comprehensive between dosing and drug storage pool, 35 kv substation, waste water balancing pond, thickener, pool, sludge dewatering machine room, water pump room and distribution room, supernatant recycling pool, row mud regulating pool, inclined plate thickener, the guard, mechanical and electrical equipment installation engineering, outdoor engineering. The first phase of the project is 300,000 cubic meters per day. Quality objective: to ensure qualified acceptance of one-time acceptance, and to create Shanghai municipal gold award. Progress target: delivered on December 31, 2009. Safe and civilized construction target: safe without accident, create a local civilization construction site. I. management difficulties and priorities 1. Key management To create a harmonious construction as the breakthrough point and the breakthrough point, people-oriented, to improve the material conditions of existence of rural migr

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档