玻璃幕墙施工工艺及技术方案(Construction process and technical plan of glass curtain wall).docVIP

玻璃幕墙施工工艺及技术方案(Construction process and technical plan of glass curtain wall).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
玻璃幕墙施工工艺及技术方案(Construction process and technical plan of glass curtain wall)

玻璃幕墙施工工艺及技术方案(Construction process and technical plan of glass curtain wall) Construction process and technical scheme of glass curtain wall 1. Installation process and technical scheme of fittings Detailed on-site construction methods and technical measures of the curtain wall component: annex ii, installation work instruction of glass and aluminum curtain wall 1.1 process description: Process: familiar with drawings and technical disclosure to be familiar with the construction site, must find embedded iron on the vertical beam lines and horizontal line control level height and depth location to spot welding, check to add welding, anticorrosive and record. 1.2 basic operation instructions: 1.2.1 familiar with drawings: understand the changes of the previous procedure and design changes. 1.2.2 familiar with the construction site: the familiar with the construction site includes two aspects, one is the acceptance of the quality of the construction process; Second, the control drawing requires the following work arrangement. 1.2.3 searching for pre-buried iron: the purpose of the embedded iron is to fix the fittings, so that the curtain wall structure is connected with the main concrete structure. Therefore, when installing the connector, the original embedded parts should be searched first. Only the embedded parts can be installed accurately. 1.2.4 control vertical beams: the centerline of the vertical beam is also the centerline of the connecting piece, so pay attention to the position of the control connector when installing, and the deviation is less than 2mm. 1.2.5 horizontal line control level and depth. Although to buried iron has the control level, but because of the influence of construction error when installing fittings will control the level and depth of horizontal position to ensure the installation accuracy of fitting, method with reference to previous process operation requirements. 1.2.6 spot welding: a temporary fixed point welding for connecting piec

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档